General
-
Is there a JSA/s in place?
-
Has this/these been communicated to personnel?
-
Are SHE / EXD directional signs in place from the start point to the top of ramps?
-
Is the haulroad free from running water (i.e. no water seeping through spoil)?
-
Are high walls and low walls stable?
-
Are drainage points free from obstructions and wing walls in place?
-
Are call up signs in place at every entrance with correct numbering and legible?
-
Are truck park ups and crib room areas compliant and maintained with correct drainage, V-Drain, signage & lighting in place?<br>
-
Are go lines constructed as per the design requirements of the Traffic Management Plan?
-
Does the dig bench appear stable?
Dig Area
Dig Area
-
Are both active mining signs in place?
-
Are area restricted signs, red lights and barricading in place for blast areas?
-
Are bund walls established outside of crest pegs (to prevent open edges)?
-
Are bund heights at 1.6m?
-
Is the light vehicle park up areas signed and in a safe location?
-
Is the area free from standing water?
-
Is the loading face height appropriate?
-
Is the access graded and free from spillage?
-
Is adequate lighting in place?
-
Is lighting plant an adequate distance from the high wall?
-
Does the high wall and low wall appear stable?
-
Does the digger bench have a small bund in place (to prevent working at heights issues, including a bund preventing access to the dig bench)?
Road Conditions
Road Conditions
-
Are road conditions on the dig bench floor adequate?
-
Are edges free of oversized rocks?
-
Are haul roads and ramps / gradient / camber adequate - max 10%?
-
Are haul roads at least 35m wide?
-
Are controls in place for narrow sections of road?
-
Is bunding in good condition and correct height?
-
Is centre bunding in place on left hand downhill corners?
-
Is catch bunding in place where roadways run below dig units?
-
Are all roads graded, no spillage, holes, etc?
-
Is adequate signage and delineation in place?
-
Are there any area where high risk bunding is required?
-
Is the high risk bunding to a standard height of 3m?
Watering Inspection
Watering Inspection
-
Observe if the water truck is working to the work instruction including:
-
Is there a 5m dry line?
-
Has a BMA Safe been conducted and controls reviewed?
-
Is single spray down ramps being adhered to?
-
Has a BMA Safe been conducted and controls reviewed?
Water Truck Inspection
-
Water Truck No:
-
Are the sprays functional?
-
Is spray width acceptable? (approx. 7m with tolerance of approx. 0.5m each way).
-
What is the spray width observed?
Dump Details
Dump 1 Details
-
Dump Location:
-
Dozer No:
-
Dozer Operator:
-
Is the APS working?
-
Is the Dump on Grade?
-
+/- metres?
-
Is light vehicle park up bay in place with signage?
-
Are both active mining area signs in place?
-
Is there another active dump?
Dump 2 Details
-
Dump Location:
-
Dozer No:
-
Dozer Operator:
-
Is the APS working?
-
Is the Dump on Grade?
-
+/- metres?
-
Is light vehicle park up bay in place with signage?
-
Are both active mining area signs in place?
-
Is there another active dump?
Dump 3 Details
-
Dump Location:
-
Dozer No:
-
Dozer Operator:
-
Is the APS working?
-
Is the Dump on Grade?
-
+/- metres?
-
Is light vehicle park up bay in place with signage?
-
Are both active mining area signs in place?
Dump 1 Inspections
Dump 1 - Inspection 1 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 1 - Inspection 2 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 1 - Inspection 3 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 2 Inspections
-
Is there a second active dump location?
Dump 2 - Inspection 1 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 2 - Inspection 2 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 2 - Inspection 3 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 3 Inspections
-
Is there a third active dump location?
Dump 3 - Inspection 1 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 3 - Inspection 2 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Dump 3 - Inspection 3 of 3
-
Time:
-
Are controls in place to prevent access below and beside advancing tip heads?
-
Is the dump square?
-
After observation - Are trucks using bunds as a guide and not as a brake?
-
Are you dumping short and pushing?
-
Is V-Drain established 10m from tip head?
-
Is dump travelling / approach surface adequate?
-
Are bund walls at required height and width. (1.6m)?
-
Are lighting plants set up for night shift?
-
Is the area free from signs of cracking or slumping?
-
Are lighting plants in place?
Sign Off
-
Comments: