Information
-
Document No.
-
Motor Installation Checklist
General
-
Time
-
ITP Inspection
-
Inspection Type
- Work to Go
- Punchlist Inspection
- General
- Punchlist Signoff
- Compliance
- Post Delivery
- Final Handover
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
-
Specific Location/s
-
Attendees
- Jared Nitschke
- Mark Sanders
- Bruce Johnston
- Patrick Doody
- Wylie Pearson
- Grant Porter
- Dave Middleton
- Phil Adlam
- Tony Pereria
- David Seaver
- Brett Heycox
- Andrew Marriott
- Michael Ross
- Deon Cordie
-
Other Attendees
Motor 3.3 kV, 690v, 415v
-
The LCS and the FCI shall be one unit with two separate compartments, one for the power isolation section and one for the local control section. Each compartment shall have individual access doors.
IP 66
-
Minimum rating.
DOL / VSD
-
Which is fitted.
Thermistors
-
Are thermistors fitted?
Heater
-
Is heater fitted?
Cable Access
-
Small motors (<75kW), looped into a full pig-tail. Larger motors (75kW and above) require a slack full half-loop.
Motor Reversing
-
Phase reversing shall be performed at the motor terminal box by reversing RED and BLUE phases. Enough length needs to be left on cores to facilitate this action.
Earth Potential
-
Connected to the main earth bar via the equipotential earth backbone.
Labels
-
All equipment shall be identified by a label attached yo a non-detachable part.
Inspector
-
Inspector
- Jared Nitschke
- Mark Sanders
- Bruce Johnston
- Patrick Doody
- Wylie Pearson
- Grant Porter
- Dave Middleton
- Phil Adlam
- Tony Pereria
- David Seaver
- Brett Heycox
- Andrew Marriott
- Michael Ross
- Deon Cordie
-
Signature