Information
-
Document No.
-
Electric Motor Checklist
General
-
Time
-
ITP Inspection
-
Inspection Type
- Installation Inspection
- General
- Punchlist Signoff
- Compliance
- Post Delivery
- Final Handover
- Damage Report
- Reinspection
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
- CV Drift
- SK041 RCS Stacker
- RE041 RCS Reclaimer
- Substation MP-SU-422
- Substation MP-SU-444
- Substation G1-SS-H01
- Substation G1-SS-A01
- CHPP
-
Specific Location/s
-
Attendees
- Mark Sanders
- Bruce Johnston
- Patrick Doody
- Wylie Pearson
- Grant Porter
- Dave Middleton
- Phil Adlam
- Tony Pereria
- David Seaver
- Andrew Marriott
- Michael Ross
- Deon Cordie
- CJ Riley
- Shaun Smith
-
Other Attendees
1. Name Plate Installed
-
-
Add notes
-
Add photos
2. Motor 3.3 kV, 690v, 415v
-
The LCS and the FCI shall be one unit with two separate compartments, one for the power isolation section and one for the local control section. Each compartment shall have individual access doors.
-
Add notes
-
Add photos
3. IP 66
-
Minimum rating.
-
Add notes
-
Add photos
4. DOL / VSD
-
Which is fitted.
-
Add notes
-
Add photos
5. Thermistors
-
Are thermistors fitted?
-
Add notes
-
Add photos
6. Heater
-
Is heater fitted?
-
Add notes
-
Add photos
7. Cable Access
-
Small motors (<75kW), looped into a full pig-tail. Larger motors (75kW and above) require a slack full half-loop.
-
Add notes
-
Add photos
8. Motor Reversing
-
Phase reversing shall be performed at the motor terminal box by reversing RED and BLUE phases. Enough length needs to be left on cores to facilitate this action.
-
Add notes
-
Add photos
9. Earth Potential
-
Connected to the main earth bar via the equipotential earth backbone.
-
Add notes
-
Add photos
10. Labels
-
All equipment shall be identified by a label attached to a non-detachable part.
-
Add notes
-
Add photos
Inspector
-
Inspector
-
Signature