Information

  • Document No.

  • Bored Piling Works Inspection

General

  • Time

  • ITP Inspection

  • Inspection Type

  • Basic Location

  • Specific Location/s

  • Attendees

  • Other Attendees

Inspection

  • Underlying Lots Closed

  • Add notes

  • Add photos

  • Pile Boring to drawing and specification

  • Add notes

  • Add photos

  • Are pile liners used

  • Piling liners installed to specfication

  • Add notes

  • Add photos

  • Reinforcing details according to drawings

  • Add notes

  • Add photos

  • Reinforcement spacers used

  • Add notes

  • Add photos

  • Prepour Inspection Acceptable

  • Add notes

  • Add photos

  • Concrete mix Approved

  • Add notes

  • Add photos

  • Concrete test results acceptable

  • Add notes

  • Add photos

  • Pile testing required

  • Integrity testing carried out

  • Add notes

  • Add photos

  • Static pile testing required

  • Add notes

  • Add photos

  • As built survey

  • Add notes

  • Add photos

Signoff

  • Inspector

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.