Information
-
Document No.
-
Concrete Works Inspection
General
-
Time
-
ITP Inspection
-
Inspection Type
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
- CV Drift
- CHPP
- Substation MP-SU-422
- Substation MP-SU-444
- Substation G1-SS-H01
- Substation G1-SS-A01
-
Specific Location/s
-
Attendees
- Mark Sanders
- Bruce Johnston
- Wylie Pearson
- David Seaver
- Mal Pringle
- PHIL Adlam
-
Other Attendees
Inspection
-
Underlying Lots Closed
-
Add notes
-
Add photos
-
Concrete Mix Approved
-
Add notes
-
Add photos
-
Water proof membrane in place
-
Add notes
-
Add photos
-
Formwork Satisfactory
-
Add notes
-
Add photos
-
Reinforcement per Drawings
-
Add notes
-
Add photos
-
Earth continuity OK
-
Add notes
-
Add photos
-
Joints Correct
-
Add notes
-
Add photos
-
Post Pour Finish per Drawings
-
Add notes
-
Add photos
-
As built survey
-
Add notes
-
Add photos
Signoff
-
Inspector
- Mark Sanders
- Bruce Johnston
- Wylie Pearson
- David Seaver
- Mal Pringle
- PHIL Adlam
-
Signature