Information
-
Document No.
-
QA/QC Veneer
-
Conducted on
-
Prepared by
Masonry Inspection
General Information
-
Weather
-
Add media
-
Job Name & No.
-
General Comments
Inspection
-
Point of reference - elevation, column line, height at which inspected
-
Add media
Veneer
-
Is correct bond used
-
Add media
-
Correct Mortar being used<br>
-
Add media
Quality of Workmanship
-
Does tooling look good
-
Add media
-
Are all bee holes filled, story poll brackets pointed in, bottom of lintels look good
-
Add media
-
Expansion Joints straight and in correct location
-
Add media
-
Expansion Joints free of mortar
-
Add media
-
are any chips in the wall<br>
-
Add media
-
Shiners<br>
-
Add media
Joint Reinforcement and Anchors
-
Correct anchor being used<br>
-
Add media
-
Correct spacing being used
-
Add media
-
Is wire being used
-
Add media
Flashing
-
Flashing installed at base<br>
-
Add media
-
Flashing installed over all penetrations
-
Add media
-
Weep vent in correct location and clean from mortar
-
Add media
-
Mortar net installed
-
Add media
Stone
-
Stone anchors
-
Add media
-
Shims being used
-
Add media
-
Tooled or caulk
-
Add media
-
Observations or Comments
-
Actions Taken
-
Add media
-
Foreman's Signature
-
Inspector Signature