Information

  • Conducted on

  • Prepared by

General Information

  • Job name and number

  • Date inspected

  • Comments

Flashing check list

  • Reference Point. Column line, elevation, height, window no.

  • Is SS Drip sealed to substrate (Lintel, CMU, Concrete, Brick ledge)?

  • Add media

  • Is thru-wall flashing sealed to SS (minimum 2 beads of sealant)?

  • Add media

  • Is thru-wall flashing attached to backup wall with term bar or installed in CMU?<br>

  • Add media

  • Is Term-bar sealed to backup wall with approved sealant?

  • Add media

  • I thru-wall flashing free of dirt, defects, holes, rips, fish mouths?

  • Add media

  • Are all seams sealed with minimum 2 beads of sealant?

  • Add media

  • Are prefab outside corners, inside corners, and end dams used

  • Add media

  • If prefab is not use, is flashing folded not cut?

  • Add media

  • Are end dams at correct location (end of steel lintels)

  • Add media

  • Have you attached photos to each section?

  • Add media

Signatures

  • Inspector

  • Superintentent

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.