Information
-
Document No.
-
QA/QC CMU
-
Conducted on
-
Prepared by
Masonry Inspection
General Information
-
Date of inspection
-
Job Name & No.
- St. Marys 13-3174
- Springfield Family Ice 13-3177
- Cameron Hospital Masonry 13-3151
- Tuttle Middle School 13-3195
- Police Crime Lab 13-3276
- Miami University 13-3270
-
Weather
-
Add media
-
General Comments
Inspection
-
Point of reference
-
Add media
CMU
-
Is correct bond used
-
Bull nose used at corners and openings
-
Correct mortar being used
-
Control Joints straight and in correct location
-
chips patched as wall being laid
-
Add media
Joint Reinforcement
-
Correct horizontal wire being used
-
Correct spacing being used
Grout
-
Bond beams at correct height
-
Bearing plates laid out correct
-
Rebar in correct location
-
Correct lap on rebar
-
rebar positioners being used
-
Using low lift grouting technique (5' or under)
-
Add media
-
Observations or Comments
-
Actions Taken
-
Add media
-
Foreman's Signature
-
Inspector Signature