Title Page
-
Site conducted
-
Date of audit
-
Name of Auditor
-
Location
-
Risk Assessment Completed
-
LOTO Sheet Filled Out
Requirements for Energy Isolation
-
Trade Locks in Place
-
Personal Lock in Place (Name, Company, Contact Number if Business Partner)
-
Is personal lock different color than trade locks
-
Can the lock be replaced as soon as possible
-
Has the system been verified as de-energized
-
Tag Explaining Reason for Lockout (this may be an FPC board or lockout sheet)
-
If electrical lockout, is the lockout at the power source
-
Was the job stopped and supervision notified
Live work and testing
-
Have exclusion zones been established
-
Is display sign on equipment stating "equipment being tested"
-
Did you utilize stop unsafe work authority