Title Page
-
Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health & Safety File.
-
Sensible Monitoring Audit Completed By:
-
Site Manager:
-
Contract Number:
-
Project Title:
-
Conducted on
General
-
Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.
-
1) Is there a register of all hazardous substances in use on the project?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) How is this register managed and new items added to is?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Have substances generated by activities been considered and included?<br>e.g. weld fumes
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Have Material Safety Data Sheets (MSDS) been provided by suppliers for all of the items?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Have COSHH assessments specific to the method of use been carried out?<br>a) Are these up to date and relevant?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) How are the findings of the COSHH assessments and any associated controls communicated to the workforce?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) Is there a system which manages the issuing of hazardous substances of the workforce?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Has anyone been appointed to manage all elements of the use of hazardous substances on the project?
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) How is the use of hazardous substances by subcontractors monitored and controlled?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) Could the use of any hazardous substances be avoided or the method of use altered to reduce exposure?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) Are those using hazardous substances wearing the correct PPE as identified by the assessment?
-
Comments:
-
Attach any images relevant to question 11 here.
-
12) Is adequate ventilation available for those using hazardous substances?
-
Comments:
-
Attach any images relevant to question 12 here.
-
13) Are hazardous substances stored in a safe place and segregated where necessary?
-
Comments:
-
Attach any images relevant to question 13 here.
-
14) Is there a system in place to deal with any spillage, fire, or contact with substance used on site?
-
Comments:
-
Attach any images relevant to question 14 here.
-
15) Are first aid and emergency arrangements in place to deal with adverse reaction, splash or ingestion of any hazardous substance?
-
Comments:
-
Attach any images relevant to question 15 here.
Sign Off Audit
-
Print Name:
-
Signature:
-
Project Manager Name:
-
Signature:
-
Designation:
-
Select date