Local Organisation and Provision of Information

  • Lagoon got a copy of the company H&S manual

  • The manual easily accessible

  • Lagoon leadership team aware and trained in their H&S responsibilities

  • Lagoon got an emergency response plan (ERP)

  • H&S notice board been installed

  • Notice board have the following information on it: minutes of meetings, fire procedures, list of fire marshals, list of first aid staff, completed H&S law poster, emergency ambulance procedure

Risk Assessments and Safe Systems of Work

  • Lagoon have site specific risk assessments (RA) and they are signed and dated by the most senior site representative

  • Lagoon ensures a team approach is used for the completion of risk assessments. Names of those involved are on the document

  • Lagoon has safe systems of work (SSOW), documented on VSOPs. They are they signed and dated

  • All colleagues have been trained in the appropriate VSOPS and evidence documented

  • Risk assessments and SSOW up to date and have they been reviewed in the last 12 months

  • Display Screen Equipment assessments been completed for all colleagues who use it

  • Risk assessments and safe systems of work documents discussed at the site safety committee meetings

Manual Handling

  • All manual handling tasks and activities been identified and assessed

  • All colleagues trained in safe manual handling techniques and is this documented. Provide evidence

  • Manual handling assessments completed by a team

  • Poor manual handling practices monitored and addressed with accordingly by management

  • Agency and ad hoc staff been provided with formal documented manual handling training

  • Refresher training completed for all colleagues employees on a periodic basis of 12 monthly

H&S Meetings

  • H&S meetings held monthly, minutes taken and communicated on the notice board

  • Meeting dates are planned and are being met

  • The agenda is followed and each lagoon represented

  • RA and accidents reviewed at the meetings and is the information documented

Accident / Incident management

  • The lagoon got an accident book and it is accessible at all times

  • It is completed fully

  • All investigations been completed in full identifying the root cause within 48 hours of the accident

  • The level of investigation appropriate to the severity of the accident

  • All reportable accidents been escalated and reported to RIDDOR

  • Lagoon is monitoring hazards and near misses. Documented evidence of near miss occurences with following up actions with documented evidence

  • Senior manager signed off the accident / incident to confirm a satisfactory investigation has taken place and that actions have been taken to prevent any recurrence

  • Evidence that RA and VSOPS have been reviewed as part of the accident investigation

First Aid

  • First Aid Risk Assessment been completed and up to date

  • First Aid cover in place based on Risk Assessment Findings

  • First Aid training up to date

  • First Aiders identified and displayed on the H&S board

  • Adequate first aid kits are available and the contents are adequate for the number of all colleagues

  • Documented first aid equipment checks are taking place on a monthly basis

  • Unused eye wash stations at every first aid station

  • Burns treatment stations in the processing and kitchen area

  • Is the First Aid Procedure (including out of hours) publicised and displayed on location notice boards

Fire Prevention

  • Emergency Evacuation Procedure publicised and displayed on all notice boards?

  • Fire Assembly Points publicised, and clearly identified

  • Fire drills completed, ensuring all colleagues take part 2 times a year

  • The results of the fire drills documented including actions to be taken where issues are identified

  • The results of the fire drills discussed at the site safety committee meeting

  • Portable fire fighting equipment inspected on a monthly basis by trained Lagoon personnel, and inspected annually by an independent contractor

  • Fire extinguishers in date

  • Fire exit doors inspected monthly by Lagoon trained personnel. They are clear of obstruction and accessible

  • Routine fire alarm tests completed across all call points on a monthly basis

  • The fire alarm serviced on an annual basis by a competent contractor

  • The fire exit signage clearly identified and displayed

  • The Emergency Lighting inspected by a competent contractor on a quarterly basis and visible in the on Lagoon log

  • Fire hazards identified and removed from Lagoon

  • Fire doors are free from debris or other obstructions, ensuring clear means of escape at all times.

Statutory and Routine Inspections

  • Register of equipment requiring statutory inspection up to date

  • Quarantine area in place and being used for isolation of defected equipment

  • Legionella / water assessments been completed and evidence documented

  • Temperature checks been completed and documented

  • Fixed electrical inspections been completed and documented

  • PAT Testing been completed and documented

Contractors

  • Copies of the risk assessments, methods statements, training records and copies of insurance provided by the contractor prior to the work commencing on Lagoon

  • Leadership team understand the requirements for controlling contractors

  • Lagoon has a authorisation to work system for the control of contractors working on Lagoon

  • All contractors given a documented induction to the site covering fire evacuation, smoking, accident reporting, rest areas and site procedures

  • On completion of the work, the area checked with the contractor prior to them leaving the Lagoon

  • When contractors are on site the area been sectioned off

  • Contractors wearing correct PPE

  • Pest control systems in place around the Lagoon

Work Equipment

  • Equipment Risk Assessment been completed and up to date

  • Inventory of all equipment documented

  • Regular servicing carried out by competent agents in accordance with manufacturers' recommendations and PUWER and evidence documented

  • Adequate training of equipment completed and documented

  • All operators familiar with pre-use checks and defect reporting procedures

  • Equipment used by trained and authorised operators only

  • Roller door operations VSOP Displayed at each roller door

  • Safe use of equipment VSOP displayed

Staff Welfare and Housekeeping

  • There are adequate toilet\washroom facilities for number and gender of all colleagues

  • They are maintained and cleaned to an acceptable standard. A schedule in place and up to date

  • Are all floors, footpaths, walkways, corridors and stairs in sound condition and without obstructions and slip\trip hazards

  • Drinking water readily available

  • Provision for boiling water and heating food

  • Designated smoking area exists

  • Smoking area signposted, marked out and briefed to all colleagues

  • There are enough tables and chairs for colleagues to sit and eat comfortably

  • Cleaning schedule in use and recorded

  • Fridges and microwaves hygienically clean and evidence demonstrated

  • All carpets, walkways and stairways in good condition

  • Consumption of only water on the shop floor floor displayed and adhered too

  • Floor marking in place to the required standards

  • All lagoon's standard signage is in place across the shop floor

  • Walkways free of obstructions

Offices

  • Office plan created and displayed. There enough space in line with DSE requirements

  • Desks clear of items/paperwork not being used

  • All Data protected documentation is locked away appropriately and is not on general view

COSHH

  • Complete inventory of all chemicals used on site up to date

  • Current MSDS held on site file

  • COSHH assessments been completed for all chemicals stored on site

  • Staff trained to use chemicals in line with COSHH assessment

  • Summary COSHH assesment displayed at point of use as part of VSOP

  • All chemicals stored appropriately as per 5S standards

  • Relevant PPE available and stored correctly

  • Process up to date and spillage kit available

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.