Title Page

  • Client:

  • Site/Project Name.

  • Contract Number

  • Conducted on

  • Prepared by

  • Site Manager

  • Contracts Manager

  • Location

Audit Summary - Positive/Negative Observations

SHE Documentation - (F10, Insurances, RAMS, CPHSP, Inductions, Permits etc)

  • Have the required items been displayed in a prominent location? (F10, Insurances, H&S Lawposter etc)

  • Are RA/MS available for all work tasks, and have RA/MS been reviewed prior to work commencing?

  • Have site specific inductions been carried out for all on site personal including visitor's?

  • Is the project Construction Phase Plan available and has this been subject to on going review?

  • Additional Comments

Ground Works

  • Are excavation support systems being used, and have these been entered onto the Temporary Works register?

  • Have suitable steps been taken to prevent falls of people,vehicles, tools or materials into excavations?

  • Have below overhead/ below ground services been identified prior to excavation work commencing?

  • Additional Comments

Asbestos Management

  • Is a copy of the Refurbishment/Demolition survey available on site? Has the Asbestos Register/Survey been communicated to relevant personnel?

  • Have Asbestos Containing Materials (ACM's) been removed prior to demolition/refurbishment work commencing?

  • Has licensed removal work been notified to HSE by the licensed removal contractor?

  • Has the licensed removal contractor provided site specific RAMS?

  • Have waste transfer consignment notes been received and copies available on site?

  • Additional Comments

Fire Safety Management

  • Are fire extinguishers provided at fire points externally and internally at suitable intervals? CARRY OUT RANDOM CHECKS ON SERVICE DATES.

  • Is there adequate means of raising the alarm on site, I.e Air Horns/Alarms provided at each fire point?

  • Are Fire and Emergency procedures displayed?

  • Are Hot Work permits being implemented?

  • Additional Comments

House Keeping Standards

  • Are materials stored/stacked in a safe and tidy manner?

  • Is debris/waste material being cleared from site regularly to reduce waste build up?

  • Additional Comments

Traffic Management & Site Access & Egress

  • Is a site specific traffic management plan available and displayed?

  • Has a segregated pedestrian route been provided from public areas to the site welfare area?

  • Is clear access available from site welfare area to the work area, and are walk routes clear around the work area?

  • Do the current access standards require improvement to gain access into the buildings?

  • Are delivery vehicles directed on site by competent vehicle marshal's?

  • Additional Comments

Demolition Activities

  • Have demolition activities been planned with a written demolition plan and RAMS in place?

  • Have utility services been isolated prior to demolition commencing?

  • Are demolition activities segregated from other site workers and those not associated with the construction works?

  • Additional Comments

Site Security Arrangements

  • Is the site fenced/hoarded to the site boundary and have lockable vehicle/pedestrian gates been provided?

  • Have any reports been received of unauthorised persons gaining access to Site?

  • Additional Comments

Site Welfare Standards

  • Are suitable welfare facilities, including canteen and toilets available on site?

  • Are site welfare areas being kept clean?

  • Has a means of heating/keeping food cool been provided for site workers within the site welfare areas?

  • Additional Comments

PPE Compliance

  • Are all workers identified as being compliant with the wearing of mandatory items of PPE? (Safety helmet, high vis and safety footwear).

  • Were any workers identified carrying out work, where they should have been wearing additional items of PPE (safety goggles/gloves/mask) as per their RAMS?

  • Additional Comments

Health Hazards - COSHH, Vibration, Manual Handling etc.

  • Are dust levels on site acceptable? Is dust supressed/extracted during work tasks?

  • Are COSHH Assessments available?

  • Are sub contractors providing HAVS assessments for their workers?

  • Are manual handling hazards being reduce on site by utilising mechanical lifting equipment?

  • Have worker health information posters been provided on site?

  • Additional Comments

Mechanical Lifting Operations

  • Has a lifting plan been prepared for lifting operations?

  • Are reports of Thorough Examination available for lifting equipment/lifting accessories?

  • Are copies of operator/slinger/signaller available?

  • Have lifting operations been segregated from other work tasks?

  • Additional Comments

Work Equipment & Plant

  • Is evidence of pre use checks available?

  • Is the work equipment in use suitable for the task being carried out.

  • Have copies of plant/equipment operator's training certificates available on site?

  • Additional Comments

Temporary Works

  • Has a TW Co-ordinator been appointed? Is the Temporary Works register available on site and up to date?

  • Additional Comments

Lighting, Including Task Lighting Standards

  • Has suitable temporary lighting been installed to the common areas? Does this include emergency lighting?

  • Are trades providing suitable task lighting?

  • Additional Comments

Noise

  • Are current noise levels on site acceptable?

  • Have noise complaints been received by Client/Site neighbours?

  • Additional Comments

Work at Height/Scaffold/Access Equipment

  • Have any faults been identified with the scaffolding? I.e. Missing brick guards, toe boards, bracing etc?

  • Has access equipment been correctly erected with safe use demonstrated?

  • Is the scaffold register available and up to date? Are defects being recorded?

  • Additional Comments

  • Additional Comments

Environmental Management

  • Is site waste being segregated on site?

  • Are fuels and chemicals stored in suitable bunds? If drums are stored on pallet bunds, do the bunds hold 110% of the total capacity of drums?

  • Are site vehicles washed down to prevent debris being transported onto publish highways?

  • Are spill kits provided and drip trays in use for plant?

  • Additional Comments

  • Site Audit Overview- General description of positive/negative items.

  • Site Manager

  • SHE Advisor

  • Report copied to:

  • Site Manager

  • Contracts Manager

  • Construction Director

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.