Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Work Scope
-
Height OverVeiw
-
Location
-
ISO Number
-
RELEVANT SUPERVISOR
-
RELEVANT PERSONAL
<br>PRIOR TO RESPONCE- SUPERVISOR TO CONFIRM<br>1. Entry into incident must be controlled via Wardens<br>2. Dynamic risk assessment must be under taken to asses situation <br>3. Only trained personnel are to undertake rescue<br>4. Safe emergency access and egress by means of of access shall be considered prior to any works being conducted<br>5. Heights rescue equipment to be available onsite.<br>6. Relevant personal to be contacted prior to first entry to assist with rescue plan development and area familiarization. <br><br>
-
Access type
-
Potential Rescue Hazards
- Medical
- Fall from Height
- Hazardous Chemicals
- Electrical
- Entrapment
- Fire
- Restricted movement
- Physiological "Acrophobia / fear of heights"
-
Will entry and exit to the work area impact on any emergency rescue
Required Heights Equipment Requirements
-
Rescue Equipment
- Trauma and Resus Kit
- Helmet
- Glasser's
- Gloves
- Working at height Harness
- Rescuer harness
- SRL
- Twin leg lanyards
- Fall restraint system "roofers kit"
- Self rescue equipment
- Rescue pole
- Ladder
- Slings
- Karabiners
- Pulleys
- Milan rescue kit
- Rope lowering system
- Basket stretcher
- EWP
- Crane
-
Communication Requirements
- Radios
- verbal
- Wiesel
-
Possible High Points {Add Photos}
-
Possible Anchor points {Add Photos}
-
Access for use of EWP/Crane
-
Possible Personal Required
-
Will rescue be complex and require external assistance
- Possible Assistance Required
- MFS Assistance Required
- SAAS Assistance Required
- SAPOL Assistance Required
- None Required
Rescue Break Down<br>• Assess situation to establish if external assistance is required.<br>• If Safe to do so entry space to apply medical treatment to the injured worker if required <br>• If able to assist worker out if space for further medical assessment and possible treatment<br>
-
1
-
2
-
3
-
4
-
5
-
6
-
7
-
8
-
9
-
10
-
11
-
12
-
13
-
14
-
15
-
16
Rescue plan Review
-
Review of rescue plan required