Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre-Pump
-
What is the machine hours reading?
-
Did you perform a Visual Inspection of the tires, motor oil, coolant, liquids, housing, belts, lights, horn, and outriggers prior to pump operations?
-
Is hydraulic oil filled to manufacturers specifications?
-
Are there any hydraulic oil leaks?
-
Are all functions of remote working properly?
-
Did you ensure greaser is full?
-
Is there grease available?
-
Are remote batteries charged?
-
Do you have extra batteries for the remote?
-
Did you ensure that the water tank and water box are full?
-
Did you ensure that all clamps are properly secured from the pump to the pipeline diversion valve?
-
Do you have the sponge ball and blow out equipment on standby?
undefined
Diversion Valve
-
Did you check for any loose or broken components?
-
Did you check all sealing rings, Gaskets, Gliding Shoes, Mounting Surfaces, Swivel Plate?
-
Is the diversion valve in good condition?
-
Did you check the oil and hydraulic levels?
-
Did you grease the valve mechanism?
Post-Pump
-
Did you make sure grease is visible at all grease points?
-
Did you check wear on "wear parts"?
-
Drain and flush out water box?
-
Did you clean build up of concrete on the machine and the hopper?
-
Did you check for any oil and fluid leaks?
-
Did you fuel the pump to "FULL"?
-
Did you clean and grease diversion valve