Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Pre-Pump

  • What is the machine hours reading?

  • Did you perform a Visual Inspection of the tires, motor oil, coolant, liquids, housing, belts, lights, horn, and outriggers prior to pump operations?

  • Is hydraulic oil filled to manufacturers specifications?

  • Are there any hydraulic oil leaks?

  • Are all functions of remote working properly?

  • Did you ensure greaser is full?

  • Is there grease available?

  • Are remote batteries charged?

  • Do you have extra batteries for the remote?

  • Did you ensure that the water tank and water box are full?

  • Did you ensure that all clamps are properly secured from the pump to the pipeline diversion valve?

  • Do you have the sponge ball and blow out equipment on standby?

undefined

Diversion Valve

  • Did you check for any loose or broken components?

  • Did you check all sealing rings, Gaskets, Gliding Shoes, Mounting Surfaces, Swivel Plate?

  • Is the diversion valve in good condition?

  • Did you check the oil and hydraulic levels?

  • Did you grease the valve mechanism?

Post-Pump

  • Did you make sure grease is visible at all grease points?

  • Did you check wear on "wear parts"?

  • Drain and flush out water box?

  • Did you clean build up of concrete on the machine and the hopper?

  • Did you check for any oil and fluid leaks?

  • Did you fuel the pump to "FULL"?

  • Did you clean and grease diversion valve

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.