Title Page
-
Site conducted
-
Conducted on
-
Location
-
Company
-
Attendees
DRAWINGS
-
Wind Farm SLD & KLD up to date
-
Control drawing up to date-OPEN
-
Control drawing up to date -CLOSED
-
Control drawings up to date-EARTH applied
-
Control drawings up to date-Safety Docs Issued
LABELLING
-
Plant and apparatus clearly identified
SETTING TO WORK
-
RAMS available, approved and in date
-
Pre-job brief completed
-
Working party sign on sheet complete
-
POWRA comlpleted
HV SAFETY RULES
-
Copies available
-
Approved for use
-
Signed as received
-
Appendices & Adendums available
-
Management Instructions available
-
Local instructions available
SWITCHING SCHEDULES
-
Copies available
-
Approved for use
-
All sections completed, signed and dated
-
Correct use of switching facilities (DLOP, Pendants, etc.)
-
References given to safety documentation
SAFETY DOCUMENTATION PTW
-
Corss referenced with switching schedule
-
Individually numbered
-
Clear concise information given
-
Signed correctly
-
Working Party signed on correctly
-
Transferred correctly (if applicable)
-
Cancelled correctly names, dates, etc.
ASSET REGISTER
-
Maintained and up to date
-
Maintained Plant History records up to date
-
PD tests recorded
-
Thermal imaging tests recorded
KEYS, LOCKS & SAFES
-
Correct locks/keys in use for each operation
-
Safety key locking system in use
-
Interlocking arrangements confirmed
SWITCHING-TOOLS AND EQUIPMENT
-
Equipment in date (PAT testes and/or certified)
-
Entered on to authorised equipment register
PERSONAL PROTECTIVE EQUIPMENT (PPE)
-
Availability of PPE
-
Type of PPE
-
Records of PPE Issue
CERTIFICATION
-
HV Authorisation certificates in date
-
Wind Turbine Safety Rules authorisation in date
-
All other competency certifications in date
-
Persons entered on key personnel register