Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Fire barriers to cavity of SFS to Gas Flues and extract vents
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Installation
-
Position of vertical fire Barrier as per A2o drawing
-
Personnel
- Installer
- A2O
-
Check siderise brackets are secured at the correct centres and length the and bracket has required fold across intumescent strip(15mm)
-
Personnel
- Installer
- A2O
-
CHeck ventilation gap between the fire barrier (RV255-120/90) and cladding is 25mm (+/- 3mm)
-
Personnel
- Installer
- A2O
-
Silver foil tape applied accross all joints and abutments
-
Personnel
- Installer
- A2O
-
Area left clean and tidy
-
Personnel
- Installer
- A2O
Completion
-
Installer Signature:
-
A2O Signature:
-
Client Signature: