Title Page
-
UKPN Pole Ref
-
What is the Upp build area
-
Upp Pole Ref
-
What is the pole to be used for
- OFDC Install
- Carrier Pole
-
What is the OFDC REF. Number
-
Is this carrier pole linked to feed an OFDC
-
What is the OFDC REF Number
-
Pole Location / Address
-
Grid Reference Eastings/Northings
-
Conducted on
-
Audit conducted by
-
What3Words location address
-
Photo of pole ID
-
Photo of top of pole 'left' view... Please ensure that all attachments are clearly visible with the left and right view photos
-
Photo of top of pole 'right' view... Please ensure that all attachments are clearly visible with the left and right view photos
-
Photo of pole including surroundings (to assist in identifying location and any install challenges)
-
Is an access agreement required to work on the pole
-
Is there a DP on the pole
-
What is the DP ID?
-
Is there vegetation on the Pole
-
Take a photograph of the heavy vegetation
-
Please take a photo clearly showing the extent of the vegetation.
-
How is the OFDC feed cable to be installed
-
How is the pole linked to the openreach chamber
-
Chamber location
-
Is the overhead route from another JUP or a BT pole
-
What is the ID of the JUP the feed cable is coming from
-
What is the BT pole/DP number
-
Is there any telecoms apparatus on this pole
-
Are there two telecoms suppliers connected to this pole (different operators, not multiple boxes)
-
Is there a fibre node on the pole?
-
Total number of telecoms cables attached to pole (customer and network)
-
Total Number of customer drop cables directly connected to the pole NOT connected via a secondary pole
-
Number of customer drop cables that are connected via another pole
-
Please sign