Information

  • Document No.

  • Asbestos

  • Time spent with the supervisor and the team

  • Audit Title

  • Client / contracts manager .

  • Conducted on

  • Audit reason , Routine / job start / job start / handover follow up visit / other

  • job / task being audited - load class.

  • Prepared by

  • Supervisor, operatives on site.

1. Documentation, planning and communication

  • 1.1. Is the method statement and risk assessment right for the task that they are carrying out?

  • 1.2. Has the content of the RAMS been communicated to all gang members and do they understand it? Also have they all signed onto the rams ?

  • 1.3. Is there a copy of the relevant drawing needed to erect the scaffold available on site, is it the correct version?

  • 1.4. Is any specialist training required for the tasks? Are employees competent and are relevant training records included? (E.g. Haki, MEWP). Also are all the training certificates in the file ?

  • 1.5. Is the rescue plan adequate for the task, have roles and responsibilities been given to the team members, are contact numbers included? Does everyone understand it?

  • Report

2. Vehicles and segregation

  • 2.1. Is the the vehicle parked in an appropriate place? Have the RAMS instructions regarding parking been followed? Are the guardrails installed on the wagon ?

  • 2.2. Have measures been taken to protect the general public or site workers from our activities? Is appropriate signage in place? Are the measure as to your method statement ?.

  • 2.3. Are they following a safe system of work unloading and loading materials? Have manual handling considerations been added into the RAMS?

  • Report

3. General scaffolding standards - compliance with TG:20.

  • 3.1. Has load class and purpose of scaffold required been identified prior to work commencing? With the information given from the design drawing ?.

  • 3.2. Have the right size pads being used for the ground conditions ? Are the standards spaced appropriately for purpose, plumb and staggered? (No 21ft tube used for topping out).

  • 3.3. Is the overall standard of the work being completed to TG-20-08 following industry best practice ?

  • 3.4. Is the gang working efficiently and productively - are daily targets going to be achieved (check against method statement\front sheet)

  • Report

4. SG4-10 compliance

  • 4.1. Do the scaffolders have their scaffold steps with them ? Also are they in good order ?and do they have the correct numbered step?

  • 4.2 . What method are they using to create a "safe zone" if use of a scaff step is not practical?

  • Report

5. PPE / RPE / Harness

  • 5.1. Are all operatives wearing the basic PPE as required by the Company - Steel toe capped boots, hard hat, gloves and high vis? Is it in good condition?

  • 5.2. Are all scaffolders wearing a fall arrest harness and lanyard. Is it fit for use? Have they carried out their daily checks? Is it being worn right ?

  • 5.3. Has additional PPE been identified in the RAMS, is it available and being used? (E.g. Glasses overalls or goggles)

  • Report

6. Ladders

  • 6.1. Are the ladders fit for use - free from damage, feet in place etc..

  • 6.2. Are the ladders positioned correctly and appropriately secured? E.g. Does the ladder protrude at least one meter past the working platform, or does it have sufficient hand holds?

  • 6.3. Has the ladder access point been considered and adequately controlled? (Use of gates / trapdoors).

  • Report

7. Manual Handling - planning and control

  • 7.1. Have manual handling risks been identified and control measures determined? Are instructions identified in RAMS being followed? Is guidance of SG6 being worked to?

  • 7.2 Have adequate controls been considered and implemented (examples: job rotation, lighter loads, trolleys, lifting equipment, etc)

  • Report

8. Emergency response and rescue planning

  • 8.1. Is there a first aid kit on site / in the vehicle? Are the contents correct? Do all men know where it is?

  • 8.2. Is there sufficient first aid cover available relative to the tasks involved?

  • 8.3. Are all members of the gang aware of the site and task emergency procedures?

  • Report

9.0 Asbestos job specific

  • 9.1. Has the pre-start check sheet been filled in before leaving the yard?

  • 9.2. If RPE is specified are the men clean shaven?

  • 9.3. Are their mask boxes in good condition? Have mask check sheets been completed before starting work?

  • 9.4. Has the transit route been identified and added on the sketch plan? Has it been identified what colour overalls are to be worked in and what colour to transit in - is this being followed?

  • 9.5. Is there a Decon on site? Is the certificate in date and is it fully working with hot running water?

  • 9.6. Are all operatives following their PPE / RPE requirements?

  • 9.7. Has the RPE usage documentation been filled out adequately?

  • Report

10. Work Environment / welfare facilities

  • 10.1 Are sufficient amenities available and identified in the RAMS? (toilets, wash areas, lunch rooms, etc)

  • 10.2. Is there sufficient lighting for the work? (Natural / artificial)

  • 10.3. Are housekeeping standards adequate? (Our employees and site in general). Are any materials left standing up? Is storage of materials adequately controlled?

  • 10.4. Are there any occupational health issues potentially linked to the work and are there adequate controls in place e.g Are noise levels controlled? Is there any risk of vibration - if so is it adequately controlled?

  • Report

11. Environmental Considerations

  • 11.1. Is waste adequately controlled - are employees aware of and understand site waste managements plans and requirements?

  • 11.2. Has potential pollution and contamination been considered?

  • Report

12. Administration and Planning

  • 12.1. Is the site file complete? Have all sections been checked and signed off (including the managers sign off)? Did the gang have all necessary information to understand the job requirements?

  • 12.2. Are all required licence / permits in place (with copies available if necessary). (e.g. Council, EPA, WHS, also Hot Works, Confined Space etc).

  • 12.3. What is the level / quality of supervision? Is everyone clear on their roles and responsibilities?

  • Report

13. Customer feed back.

  • 13.1. Is the customer happy with the service they have received from our employees (attitude, behaviour, etc)?

  • 13.2. Are they happy with the delivery and standard of scaffolding?

  • 13.3. Has the scaffold been erected / dismantled with in their times scale?

  • 13.4. Overall how satisfied is the customer with the service they have received from High Peak Scaffolding Ltd - <br><br>Very satisfied Satisfied Disappointed Very disappointed. (Please circle as appropriate and add additional comments to explain answer if possible)

Corrective Actions

  • Enter any corrective actions that will be undertaken.

Sign Off

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.