Information
-
Document No.
-
Asbestos
-
Time spent with the supervisor and the team
-
Audit Title
-
Client / contracts manager .
-
Conducted on
-
Audit reason , Routine / job start / job start / handover follow up visit / other
-
job / task being audited - load class.
-
Prepared by
-
Supervisor, operatives on site.
1. Documentation, planning and communication
-
1.1. Is the method statement and risk assessment right for the task that they are carrying out?
-
1.2. Has the content of the RAMS been communicated to all gang members and do they understand it? Also have they all signed onto the rams ?
-
1.3. Is there a copy of the relevant drawing needed to erect the scaffold available on site, is it the correct version?
-
1.4. Is any specialist training required for the tasks? Are employees competent and are relevant training records included? (E.g. Haki, MEWP). Also are all the training certificates in the file ?
-
1.5. Is the rescue plan adequate for the task, have roles and responsibilities been given to the team members, are contact numbers included? Does everyone understand it?
-
Report
2. Vehicles and segregation
-
2.1. Is the the vehicle parked in an appropriate place? Have the RAMS instructions regarding parking been followed? Are the guardrails installed on the wagon ?
-
2.2. Have measures been taken to protect the general public or site workers from our activities? Is appropriate signage in place? Are the measure as to your method statement ?.
-
2.3. Are they following a safe system of work unloading and loading materials? Have manual handling considerations been added into the RAMS?
-
Report
3. General scaffolding standards - compliance with TG:20.
-
3.1. Has load class and purpose of scaffold required been identified prior to work commencing? With the information given from the design drawing ?.
-
3.2. Have the right size pads being used for the ground conditions ? Are the standards spaced appropriately for purpose, plumb and staggered? (No 21ft tube used for topping out).
-
3.3. Is the overall standard of the work being completed to TG-20-08 following industry best practice ?
-
3.4. Is the gang working efficiently and productively - are daily targets going to be achieved (check against method statement\front sheet)
-
Report
4. SG4-10 compliance
-
4.1. Do the scaffolders have their scaffold steps with them ? Also are they in good order ?and do they have the correct numbered step?
-
4.2 . What method are they using to create a "safe zone" if use of a scaff step is not practical?
-
Report
5. PPE / RPE / Harness
-
5.1. Are all operatives wearing the basic PPE as required by the Company - Steel toe capped boots, hard hat, gloves and high vis? Is it in good condition?
-
5.2. Are all scaffolders wearing a fall arrest harness and lanyard. Is it fit for use? Have they carried out their daily checks? Is it being worn right ?
-
5.3. Has additional PPE been identified in the RAMS, is it available and being used? (E.g. Glasses overalls or goggles)
-
Report
6. Ladders
-
6.1. Are the ladders fit for use - free from damage, feet in place etc..
-
6.2. Are the ladders positioned correctly and appropriately secured? E.g. Does the ladder protrude at least one meter past the working platform, or does it have sufficient hand holds?
-
6.3. Has the ladder access point been considered and adequately controlled? (Use of gates / trapdoors).
-
Report
7. Manual Handling - planning and control
-
7.1. Have manual handling risks been identified and control measures determined? Are instructions identified in RAMS being followed? Is guidance of SG6 being worked to?
-
7.2 Have adequate controls been considered and implemented (examples: job rotation, lighter loads, trolleys, lifting equipment, etc)
-
Report
8. Emergency response and rescue planning
-
8.1. Is there a first aid kit on site / in the vehicle? Are the contents correct? Do all men know where it is?
-
8.2. Is there sufficient first aid cover available relative to the tasks involved?
-
8.3. Are all members of the gang aware of the site and task emergency procedures?
-
Report
9.0 Asbestos job specific
-
9.1. Has the pre-start check sheet been filled in before leaving the yard?
-
9.2. If RPE is specified are the men clean shaven?
-
9.3. Are their mask boxes in good condition? Have mask check sheets been completed before starting work?
-
9.4. Has the transit route been identified and added on the sketch plan? Has it been identified what colour overalls are to be worked in and what colour to transit in - is this being followed?
-
9.5. Is there a Decon on site? Is the certificate in date and is it fully working with hot running water?
-
9.6. Are all operatives following their PPE / RPE requirements?
-
9.7. Has the RPE usage documentation been filled out adequately?
-
Report
10. Work Environment / welfare facilities
-
10.1 Are sufficient amenities available and identified in the RAMS? (toilets, wash areas, lunch rooms, etc)
-
10.2. Is there sufficient lighting for the work? (Natural / artificial)
-
10.3. Are housekeeping standards adequate? (Our employees and site in general). Are any materials left standing up? Is storage of materials adequately controlled?
-
10.4. Are there any occupational health issues potentially linked to the work and are there adequate controls in place e.g Are noise levels controlled? Is there any risk of vibration - if so is it adequately controlled?
-
Report
11. Environmental Considerations
-
11.1. Is waste adequately controlled - are employees aware of and understand site waste managements plans and requirements?
-
11.2. Has potential pollution and contamination been considered?
-
Report
12. Administration and Planning
-
12.1. Is the site file complete? Have all sections been checked and signed off (including the managers sign off)? Did the gang have all necessary information to understand the job requirements?
-
12.2. Are all required licence / permits in place (with copies available if necessary). (e.g. Council, EPA, WHS, also Hot Works, Confined Space etc).
-
12.3. What is the level / quality of supervision? Is everyone clear on their roles and responsibilities?
-
Report
13. Customer feed back.
-
13.1. Is the customer happy with the service they have received from our employees (attitude, behaviour, etc)?
-
13.2. Are they happy with the delivery and standard of scaffolding?
-
13.3. Has the scaffold been erected / dismantled with in their times scale?
-
13.4. Overall how satisfied is the customer with the service they have received from High Peak Scaffolding Ltd - <br><br>Very satisfied Satisfied Disappointed Very disappointed. (Please circle as appropriate and add additional comments to explain answer if possible)
Corrective Actions
-
Enter any corrective actions that will be undertaken.
Sign Off
-
Auditor's signature