1. Documentation, planning and communication
-
1.1. Is the method statement and risk assessment right for the task that they are carrying out?
-
1.2. Has the content of the RAMS been communicated to all gang members and do they understand it? Also have they all signed onto the rams ?
-
1.3. Is there a copy of the relevant drawing needed to erect the scaffold available on site, is it the correct version?
-
1.4. Is any specialist training required for the tasks? Are employees competent and are relevant training records included? (E.g. Haki, MEWP). Also are all the training certificates in the file ?
-
1.5. Is the rescue plan adequate for the task, have roles and responsibilities been given to the team members, are contact numbers included? Does everyone understand it?
-
Report
-
Report
2. Vehicles and segregation
-
2.1. Is the the vehicle parked in an appropriate place? Have the RAMS instructions regarding parking been followed? Are the guardrails installed on the wagon ?
-
2.2. Have measures been taken to protect the general public or site workers from our activities? Is appropriate signage in place? Are the measure as to your method statement ?.
-
2.3. Are they following a safe system of work unloading and loading materials? Have manual handling considerations been added into the RAMS?
-
Report
3. General scaffolding standards - compliance with TG:20.
-
3.1. Has load class and purpose of scaffold required been identified prior to work commencing? With the information given from the design drawing ?.
-
3.2. Have the right size pads being used for the ground conditions ? Are the standards spaced appropriately for purpose, plumb and staggered? (No 21ft tube used for topping out).
-
3.3. Is the overall standard of the work being completed to TG-20-08 following industry best practice ?
-
3.4. Is the gang working efficiently and productively - are daily targets going to be achieved (check against method statement\front sheet)
-
Report
-
Report
4. SG4-10 compliance
-
4.1. Do the scaffolders have their scaffold steps with them ? Also are they in good order ?and do they have the correct numbered step?
-
4.2 . What method are they using to create a "safe zone" if use of a scaff step is not practical?
-
Report
5. PPE / RPE / Harness
-
5.1. Are all operatives wearing the basic PPE as required by the Company - Steel toe capped boots, hard hat, gloves and high vis? Is it in good condition?
-
5.2. Are all scaffolders wearing a fall arrest harness and lanyard. Is it fit for use? Have they carried out their daily checks? Is it being worn right ?
-
5.3. Has additional PPE been identified in the RAMS, is it available and being used? (E.g. Glasses overalls or goggles)
-
Report
6. Ladders
-
6.1. Are the ladders fit for use - free from damage, feet in place etc..
-
6.2. Are the ladders positioned correctly and appropriately secured? E.g. Does the ladder protrude at least one meter past the working platform, or does it have sufficient hand holds?
-
6.3. Has the ladder access point been considered and adequately controlled? (Use of gates / trapdoors).
-
Report
7. Manual Handling - planning and control
-
7.1. Have manual handling risks been identified and control measures determined? Are instructions identified in RAMS being followed? Is guidance of SG6 being worked to?
-
7.2 Have adequate controls been considered and implemented (examples: job rotation, lighter loads, trolleys, lifting equipment, etc)
-
Report
8. Emergency response and rescue planning
-
8.1. Is there a first aid kit on site / in the vehicle? Are the contents correct? Do all men know where it is?
-
8.2. Is there sufficient first aid cover available relative to the tasks involved?
-
8.3. Are all members of the gang aware of the site and task emergency procedures?
-
Report
9. Work Environment / welfare facilities.
-
9.1. Are sufficient amenities available and identified in the RAMS? (toilets, wash areas, lunch rooms, etc)
-
9.2. Is there sufficient lighting for the work? (Natural / artificial)
-
9.3. Are housekeeping standards adequate? (Our employees and site in general). Are any materials left standing up? Is storage of materials adequately controlled?
-
9.4. Are there any occupational health issues potentially linked to the work and are there adequate controls in place e.g Are noise levels controlled? Is there any risk of vibration - if so is it adequately controlled?
-
Report
10. Environmental Considerations
-
10.1. Is waste adequately controlled - are employees aware of and understand site waste managements plans and requirements?
-
10.2. Has potential pollution and contamination been considered?
-
Report
11. Administration and Planning
-
11.1. Is the site file complete? Have all sections been checked and signed off (including the managers sign off)? Did the gang have all necessary information to understand the job requirements?
-
11.2. Are all required licence / permits in place (with copies available if necessary). (e.g. Council, EPA, WHS, also Hot Works, Confined Space etc).
-
11.3. What is the level / quality of supervision? Is everyone clear on their roles and responsibilities?
-
Report
12. Customer feed back.
-
12.1. Is the customer happy with the service they have received from our employees (attitude, behaviour, etc)?
-
12.2. Are they happy with the delivery and standard of scaffolding?
-
12.3. Has the scaffold been erected / dismantled with in their times scale?
-
12.4. Overall how satisfied is the customer with the service they have received from High Peak Scaffolding Ltd - <br><br>Very satisfied Satisfied Disappointed Very disappointed. (Please circle as appropriate and add additional comments to explain answer if possible)4.
Corrective Actions
-
Enter any corrective actions that will be undertaken.
-
Add media