Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Check that the door/s open and close correctly and check the strip around the top and sides of the door is intact
-
Door number 1 - Office Cupboard door
-
Door number 2 - Main Office door
-
Door number 3 - Disabled Toilet Reception
-
Door number 4 - Reception Toilet
-
Door number 5 - Staff Toilet
-
Door number 6 - Kitchen
-
Door number 7 - Cupboard by kitchen
-
Door number 8 - Electric Cupboard
-
Door number 9 - Community Room
-
Door number 10 - Community room cupboard
-
Door number 11 - Gym
-
Door number 12 - Sports Hall
-
Door number 14 - Sports Hall Far End
-
Door number 15 - Attic
-
Door number 17 - Attic Double Doors
-
Door number 18 - Attic Far End
-
Door number 19 - LRC
-
Door number 20 - LRC office door
-
Door number 21 - LRC corridor
-
Door number 22 - Cleaning Cupboard
-
Door number 23 - Girls Changing Rooms
-
Door number 24 - Boys Changing Rooms
-
Door number 26 - Storage Cupboard
-
Door number 27 Disabled Toilet
-
Door number 28 - Female Toilets
-
Door number 29 - Male Toilets
-
Door number 30 - PE Office
-
Name
-
Add signature