Title Page

  • HSE site safety walk

  • Safety Walk must be carried out once a week in each project and this protocol must be sent to local HSE department and MCR manager

  • The site inspection represents a spot check. Undocumented deviations or observations do not mean that they do not exist

  • Please include photographic evidence where applicable during the safety walk

Site Audit information

  • Project Name

  • Project Number

  • Date of safety walk

  • Safety walk carried out by

  • Type of works taking place

  • Contractors working on site:

  • Short description of the works that were carried out during the safety walk

Has the equipment a valid inspection? Conduct spot checks of 4 items of equipment’s inspection :

  • Has the equipment a valid inspection? Conduct spot checks of the equipment’s inspection and register the results of 4 here:

  • Item 1 : Type of equipment (e.g. lifting equipment, fall protection, electric powered tools, ladders etc.) SNo: Serial number VD: Date until when the inspection is valid

  • Item 1 Valid inspection Date :

  • Visual check ok / not ok

  • In case of not OK immediate actions:

  • Item 2 : Type of equipment (e.g. lifting equipment, fall protection, electric powered tools, ladders etc.) SNo: Serial number VD: Date until when the inspection is valid

  • Item 2 Valid inspection Date :

  • Visual check ok / not ok

  • In case of not OK immediate actions:

  • Item 3 : Type of equipment (e.g. lifting equipment, fall protection, electric powered tools, ladders etc.) SNo: Serial number VD: Date until when the inspection is valid

  • Item 3 : Valid inspection Date :

  • Item 3 : Visual check ok / not ok

  • In case of not OK immediate actions:

  • Item 4: Type of equipment (e.g. lifting equipment, fall protection, electric powered tools, ladders etc.) SNo: Serial number VD: Date until when the inspection is valid

  • Item 4 Valid inspection Date :

  • Item 4 : Visual check ok / not ok

undefined

  • Pedestrian walk was marked and outlined on site

  • Site / hardstand Escape and emergency routes are free accessible?

  • Exclusion zones marked on site?

  • Containers placed outside of the working radius?

  • Condition of containers - housekeeping

  • Are containers / generators earthed and is the protocol available?

  • Workplace is cleaned and tidy (No tripping hazards by cables, waste removed and disposed the correct way)?

  • Welfare facilities available on site

  • Is the waste separated according to the local regulations?

  • Condition of the crane pad (level and even? No slipping or tripping hazards caused by e.g. ice, mud, potholes etc.?

  • Teleporter - no leaks, mirrors present not cracked, reversing siren, tyres, windows (glass clean)

  • Accessory equipment for telehandler (e.g. for lifting equipment)

  • Fire extinguishers available at ground level and in the nacelle?

  • Does a daily team toolbox meeting take place and are the crane drivers included (when applicable)?

  • Recorded and documented daily TBT by contractor?

  • Are defined measures incl. responsibilities from the daily construction meeting and the team toolbox meeting implemented?

  • Rescue Equipment available for WAH is applicable for contractor - (rescue barrel)

  • Is the correct PPE used specific for the task (fall protection, hearing protection etc.)?

  • Is the fall protection used in a correct manner (Correct attachment points etc.)?

  • Are hazardous substances stored correctly and with correct labeling in conjunction with local regulations?

  • Condition of the equipment ( tools, generators, man baskets, MEWP (cherry pickers) etc.)?

  • Is an effective communication between the team, the crane driver or other trades working on the same PSP guaranteed?

  • Are risk assessments available for the works that are carried out and is it specific for the WEC type

  • Are all risks considered in the risk assessment and contractors have signed on to RAMS

  • Crane

  • Last inspection valid until:

  • Visual check ok /not ok:

  • Condition of cranes (no leaks, inspection record available, earthing)

  • Evidence available of recent equipment check by contractors GA2?

  • Mobile refuelling stations

  • Further observations

  • Action to be taken

  • Responsible person for close out

  • Closing date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.