Information
-
Project Name
-
Conducted on
-
Prepared by
Observations
-
Were you able to visit with the PM about HSE
-
If so, did the PM know the project TRIR and DART
-
Does the PM participate in the project safety walks<br>
-
Was PPE readily available for your use
-
Were you escorted on the project walk
-
Were underground utilities identified
-
Was all equipment working a safe distance from overhead power lines
-
Confined Space Entry
-
Cranes & Rigging
-
Concrete & Masonry
-
Electrical
-
Environmental
-
Excavations
-
Fall Protection
-
Hand and power tools
-
Heavy Equipment
-
Hot Work
-
Housekeeping
-
Ladders
-
Personal Protective Equipment (PPE)<br>• Project workers consistently use the project basic PPE (hard hat, safety glasses, gloves, work boots, vests)<br>• Additional PPE documented on THA/DSPTP when needed, and worn properly<br>• Proper training (fall protection, respirators, etc)
-
Positive safe work practices to highlight
-
Photos
-
Summary
-
Summary
-
Participants