Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add location
-
Select date
1. SITE SET-UP
-
1.1 Safe / at risk?
2. DOCUMENTATION AND TRAINING
-
2.1 General paperwork
-
2.2 All subbies on site have been PQQ'd?
-
2.3 All RAMS present in site files, assessed, signed-off by Rackham, and operatives?
3. EMERGENCY PROCEDURES
-
3.1 Safe / at risk?
4. INSPECTIONS
-
4.1 Safe / at risk?
5. HOUSEKEEPING
-
5.1 Safe / at risk?
6.0 WORKING AT HEIGHT
-
6.1 General
-
6.2 Scaffolds
-
6.3 Ladders
-
6.4 Harnesses and other associated equipment
7. PLANT AND EQUIPMENT
-
7.1 Safe / at risk?
8. LOLER
-
8.1 Safe / at risk?
9. ELECTRICAL SAFETY
-
9.1 Safe / at risk?
10. PERMIT WORKS
-
10.1 Safe / at risk?
11. STORAGE
-
11.1 Safe / at risk?
12. EXCAVATIONS
-
12.1 Safe / at risk?
13. CONCRETE & MASONRY
-
13.1 Safe / at risk?
14. DEMOLITION
-
14.1 Safe / at risk?
15. PPE
-
15.1 Safe / at risk?
16. OCCUPATIONAL HEALTH
-
16.1 Safe / at risk?
17. ENVIRONMENTAL
-
17.1 Safe / at risk?
18. ASBESTOS
-
18.1 Safe / at risk?
19. QUALITY ASSURANCE
-
19.1 Procurement (materials, plant, tool-hire etc.) policies all being followed?
-
19.2 Site run efficiently in all areas (theft risk; storage of materials; wastage etc)