Information
-
Document No.
-
Project Name
-
Job Number
-
Conducted on
-
Conducted by
-
Location
-
Personnel present at time of inspection
-
Persons wearing hard hats
-
Persons wearing protective footwear
-
Electrical equipment tested and tagged
-
Exposed ends of cables turned and taped
-
Eye / ear protection worn as required
-
Site office and amenities in a presentable state i.e. clean and tidy
-
Bar caps to starter bars
-
Leads suspended out of reach
-
Handrails to all slab edges
-
Safe access to all areas
-
Site clean and tidy
-
Site secured from unauthorised access
-
Public spaces free from hazards
-
Persons not smoking in buildings and crib sheds
-
Sediment control in place
-
Air borne dust being suppressed
-
Inspection and Test Plans available and up to date
-
Current drawing register available
-
Drawings stamped and signed by Project Manager
-
Drawings match drawing register
-
Other HSEQ issues discussed:
-
Names of PDQ employees and or subcontractors consulted in regards to HSEQ issues:
-
Person Conducting Inspection Signed:
-
Site Supervisor Present During inspection Signed:
Corrective Actions
-
Corrective Actions Taken
-
Corrective Actions Completed Signed: