Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. HSEQ Management Plans

  • 1.1. Is the Safety, Quality, and Environmental Management Plan for the Quarry on site? (Check that it has been signed and dated).

  • 1.2. Have all Staff and Subcontractors undertaken the HSE Induction for the site?. (Blue/White Cards sighted)

  • 1.3. Are Safe Work Method Statements available for all high risk activities?. (Check that relevant staff have signed SWMS)

  • 1.4. Are Incident/NCR books available?. (Check to see if any completed, have they been added to the FIXIT Diary and appropriate actions taken to close out)

  • 1.5. Have Toolbox Talks been completed?.

  • 1.6. Are Emergency telephone numbers available/displayed?.

2. Site Access

  • 2.1. Has there been any unauthorised access to the Quarry Site. (Gates locked at night)

  • 2.2. Are all personnel accessing the Quarry calling ahead to the Site Supervisor for approval to enter the Quarry Site?

3. Flora & Fauna

  • 3.1. Extent of clearing has been delineated using markers (no over clearing), with topsoil and overburden maintained where possible for future rehabilitation in completed areas?.

  • 3.2. All cleared trees and vegetation have been stockpiled for future rehabilitation (no unauthorised felling or removal of vegetation).

  • 3.3. No domestic animals present on site (staff or visitors are not bringing pets to site).

  • 3.4. No damage to surrounding vegetation during extraction activities (excess soil/rocks placed around base of trees or vehicles going off formed tracks).

4. Erosion and Sediment Control

  • 4.1. Are erosion and sediment control devices in place prior to any clearing activities commencing on site.

  • 4.2. Erosion and sediment control devices have been checked and maintained following rain events.

  • 4.3. Have topsoil and overburden stockpiles been vegetated to prevent erosion?

5. First Aid

  • 5.1. First-aid Officer's identity displayed?.

  • 5.2. Are the contents of the first-aid kit as per the contents list and are in date?.

6. Signage

  • 6.1. Are relevant signs displayed (e.g. Warning signs, traffic signs, call point signs, PPE)?.

  • 6.2. Are signs in good condition (clean and not faded)?.

7. Personal Protective Equipment (PPE)

  • 7.1. PPE is maintained and in good condition (boots not falling apart, shirts not faded, helmets in date, 3 years) and being worn correctly?.

  • 7.2. PPE is available and appropriate to tasking (ear plugs, face shield, dust mask)?.

8. Fueling and Maintenance

  • 8.1. There has been no major vehicle maintenance conducted on site (daily pre-start maintenance permitted).

  • 8.2. Refueling has only been undertaken in designated areas.

  • 8.3. Spills or leakage of any fuel stores have been fixed and remediated and absorbent materials restocked?.

  • 8.4. No empty grease cartridges left laying around.

9. Plant and Equipment

  • 9.1 Have daily Machine Pre-start checks been completed and recorded?.

  • 9.2. Operators hold appropriate certification or have completed a VOC where required?.

  • 9.3. Are trainee operators supervised, have a training plan and maintain a written training record/logbook?.

  • 9.4. Warning lights and reversing beepers operating and all anti-slip surfaces in good condition?.

  • 9.5. Are all relevant guards in place and in good condition?

10. Noise

  • 10.1. All equipment has been effectively muffled and well maintained?.

  • 10.2. Have any noise or vibration complaints been received?.

  • 10.3. Is the hearing protection provided appropriate for the level of noise emitted?.

11. Working at Heights

  • 11.1. Are Ladders in good condition and rated greater than 120kg (not domestic).

  • 11.2. Are Ladders set up on firm flat ground with solid footing, no loose material or debris at base with access ladders extended 1m past point of access and secured?.

  • 11.3. Only Platform Ladders are being used to work from, all other ladders are for access only?.

  • 11.4. Are bench heights no greater than 10m?

  • 11.5. Are bunds in place at the top of the bench and the toe of the bench and at a same distance to prevent possible falls and engulfment?

12. Impacts on Water Quality

  • 12.1. Storm water run off from site is controlled.

13. Air Quality

  • 13.1. Plant & Equipment exhaust emissions minimised by ensuring maintenance is undertaken at nominated periods.

  • 13.2. Roads have been watered to control dust and truckloads covered, as necessary.

  • 13.3. There has been no burning of waste on site?.

14. Hazardous Chemicals / Storage

  • 14.1. Spillage bunds suitable to materials and quantity being stored (110% largest container)?.

  • 14.2. Material Safety Data Sheet (MSDS) register is readily available and MSDS are current (5 years from issue date)?.

  • 14.3. Has a "Risk Assessment" been completed for Hazardous/Dangerous good on site?.

  • 14.4. Where required sand or soil shall be used for Emergency Spills with spoil dumped at a regulated waste station.

  • 14.5. Are all chemical containers, including decanted containers, labeled appropriately?.

15. Amenities/Work Areas

  • 15.1. Is the Weighbridge office clean and tidy (no trip/slip hazards) and does regular waste removal occur?.

  • 15.2. Is there a Fire Extinguisher provided (where required) and is it in test date (6 months)?.

  • 15.3. Is there adequate supply of drinking water, hand washing facilities and toilets available?.

  • 15.4. Are work areas tidy and staff using good stacking and storage practices?.

16. Traffic Management

  • 16.1. Is a Traffic Management Plan in place with signage setup as per the plan advising roadwork in progress?.

  • 16.2. Have all personnel been made aware of the current traffic requirements and completed the Traffic Management Induction?

  • 16.3. Has pedestrian traffic been considered (where required)?.

  • 16.4. Is road signage located correctly, clean, visible and effective (is traffic following signage)?.

  • 16.5. Is bund in place along access road?

17. Waste Management

  • 17.1. General litter, (food containers, plastic wrap) controlled via closed top bins/bags and emptied regularly?

  • 17.2. Waste generated from maintenance/servicing plant has been removed from Quarry site.

  • 17.3. Quantities of materials on site has been minimised to reduce waste generation.

  • 17.4. Materials to be recycled are identified and segregated from waste material.

18. Task Observation.

  • 18.1. Complete a Task Observation against a SWMS.

fgf FIXIT Raised.

Date FIXIT Closed-Out:

Recommendations

Sign off - Personnel Completing Inspection

  • Name and Role of fgf personnel conducting audit.

Sign off - Site Senior Executive or Site Supervisor

  • Name and signature of Site Senior Executive

  • Site Senior Executive comments.

  • Name and signature of Site Supervisor.

  • Site Supervisor comments.

Discussed at Operations Meeting - Dated: Murray Moule - Bruce Williams - Chris Barker - Brendan Rogina - Warren McKenzie - Mark Jeynes -

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.