Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Entry

  • Is access adequate, safe and not posing problems for workers and general public?

  • Project and Safety signs are displayed and secured at the entrance of the site?

  • Is rock shaker grid in place at the entrance to the site and is being maintained?

PPE Compliance

  • All mandatory PPE is being worn by all personnel including Subcontractors.

  • Additional PPE is being acknowledged on SWMS (if applicable).

Mobile Plant

  • Pre start check has been completed and documented including Subcontractor Plant.

  • Operator Competent to operate machine / VOC Completed.

  • PCBU Verification of Competency letter completed for Subcontractors operating plant on site?

Electrical Hazards

  • Electrical Equipment is tagged.

  • No Electrical leads joined.

  • RCD Protection is being used.

HouseKeeping

  • House Keeping maintained.

  • All rubbish removed from work area and placed in waste pile / bin.

  • Work areas clean and tidy.

Hazardous Substances

  • Are SDS sheets and register on site for all chemicals in use and are they with-in the 5year expiry date.

  • Chemicals clearly labelled and in approved containers.

General Safety

  • Is there an IPMP available on site for the works being completed?

  • Has a Hazard Identification inspection been completed and the Hazard Risk Register updated?

  • Have all staff including subcontractors completed a Site Specific Induction?

  • Have Daily Pre-start meetings been held?

  • Are Toolbox Talks being completed on a regular basis?

  • Have Weekly Site Inspections been completed and any actions signed and completed?

  • First-Aid Kit available with contents in date?

  • Have SWMS been completed for the tasks on site, including Subcontractor activities?

  • Underground / Overhead services identified and correct process being followed.

  • Correct Permits Raised, (Confined Space) Available on the Job, Permit is still current.

  • Lifting Equipment tagged and Certified.

  • Are trenches / excavations benched / battered correctly?

  • Barricades in place where required e.g. Trenches, excavations, hazards.

  • Ladders secured 4:1, tied off.

Task Observation.

  • Complete a Task Observation against a SWMS.

Environmental.

  • Site vehicles are not taking mud and dirt onto public roads?

  • Are erosion and sediment control devices in place and being maintained.

  • Any stockpiles have silt fence on down slope side.

  • Are dust controls in place?

Quality.

  • Have ITP's been completed with relevant HOLD POINTS signed?

fgf FIXIT Raised.

Date FIXIT Closed-Out:

Comments.

  • Add signature

Discussed at Operations Meeting - Dated: Murray Moule - Bruce Williams - Chris Barker - Brendan Rogina - Warren McKenzie - Dave Harwood - Mark Jeynes -

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.