Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Integrated Project Management Plan (IPMP).
-
Has a IPMP been completed for the project/work (check date issued).
-
Have all staff and sub-contractors received a site specific induction and white/blue cards sighted (check a few).
-
Are Safe Work Method Statements available for all high risk activities.
-
Are emergency telephone numbers available/displayed.
-
Are incident/NCR forms available? (Check to see if any completed for HSEQ, and have been added to the FIXIT Diary with appropriate actions taken to close out)?
-
Has Foreman/Supervisor completed Hazard Identification Checklist for job site?
-
Have Weekly Inspections, Daily Pre-starts/Toolbox Talks been completed.
-
Have Construction Drawings been issued for the project? (Check that drawings are current).
Site Access.
-
Is site secured with fencing and signage displayed at entrances restricting access? (Where required)
-
Is site signage displayed at the entrance to the project (Project signage, QBSA number, Unauthorised entry signs)?
-
Are footpaths clean and clear, Vehicle crossovers have no pedestrian trip hazards?<br>
Environmental Controls.
-
Rain events have the potential to destabilise excavations, undermine scaffolding supports or supports for precast elements etc. (Inspect the effect of rain or water events on site)
-
Are erosion and sediment control devices in place prior to excavation works commencing on site?
-
Are storm water/kerb inlet pits fitted with protection (where required)?
Amenities / Work Areas.
-
Is site office clean and tidy (no trip/slip hazards) and does regular waste removal occur?<br>
-
Is there adequate supply of drinking water, hand washing facilities and toilets available?<br>
-
Are work areas tidy and staff using good stacking and storage practices?
-
Are vehicles and plant not directly involved in construction activities, parked clear of work area and public thoroughfares?
First Aid.
-
First-aid equipment is available with all items in date?
-
First-aid Officer's names clearly displayed?<br>
Housekeeping.
-
Site access ways clear of material and waste?<br>
-
Site personnel are cleaning up after each days activities?<br>
-
Trip hazards are all removed progressively?<br>
-
No build up of waste on site?<br>
-
Protrusions are protected (Reo capped and sharp objects guarded)?
Personal Protective Equipment (PPE).
-
PPE is maintained and in good condition (boots not falling apart, shirts not faded/torn, helmets in date 3 years) and being worn correctly?
-
Use of PPE is appropriate to tasking (Goggles for over head drilling, face shields/dust masks for grinding/cutting concrete)?<br>
Electrical Equipment / Power Tools.
-
A handover certificate exists for all temp boards and site shed?<br>
-
Temp boards are in good repair and RCD tested each month?<br>
-
Electric leads are not exposed to mechanical damage (Suspended where required or exposed to potential damage), not run on the floor in access ways?
-
Checked test tags are within test dates (3 months)?<br>
-
Are Generators protected by RCD's a have they been tested to ensure correct operation?
-
Are all leads plugged into RCD's (no double adapters or piggy back plugs)?
-
Are portable power tools in good condition with all guards in place and stored out of the weather?
Trenching and Excavation.
-
Overhead services clear of excavation zone, is electrical spotter required (works is 3m exclusion zone)?
-
All services located (prior to excavation) with copy of locations included in project folder?<br>
-
Benching at not more than 1.5m steps (1m steps preferred) and 1 in 1?
-
Trenches/excavations left unattended are barricaded?<br>
-
Access ladders in trenches at 9m intervals where depth is greater than 1m?<br>
Working at Heights.
-
Ladder access provided and secured?
-
Workers using harnesses have been trained for their use and have a fallen worker retrieval procedure?<br>
-
Exclusion zones are maintained below workers and signs placed (if required) to state "Workers Above"?<br>
-
Access systems are suitable for taking tools and materials up to the working platform?
-
Controls are in place to prevent falling objects?
Ladders.
-
Are Ladders in good condition and rated greater than 120kg (not domestic)?
-
Access ladders extend 1m past point of access and are secured?<br>
-
Persons using ladders maintain 3 points of contact, are not over reaching, pulling or pushing potentially over turning the ladder?<br>
-
Ladders are set up on firm flat ground with solid footing, no loose material or debris at base?
Scaffold.
-
Drawings held on site for erected scaffold?
-
Erected scaffolds have been certified by competent person and re-certified every 30 days?<br>
-
Scaffold decks clear of debris and trip hazards?
-
Are gaps in working platform boards <25mm with a total of all accumulative gaps not exceeding 50mm?
-
Are lap boards secure against uplift?
-
Are top and middle rails fitted, are kick boards in place, are containment screen fitted/required?
Plant and Equipment.
-
Have daily Pre-Start checks been completed and recorded?<br>
-
Operators hold certification and or have completed a VOC where required?<br>
-
Safety pins used on excavator/backhoe quick hitch attachments?<br>
-
Warning lights and reversing beepers operating and all anti-slip surfaces in good condition?
Scissor / Boom Lifts.
-
Operators have High Risk Work Licence for 11m+ and yellow card for scissor lifts or similar for under 11m?
-
Every operator has completed a Pre-Start check and signed the log book?<br>
-
There are no penetrations or drop off edges unprotected in EWP operating areas?<br>
-
Overhead power precautions detailed in the SWMS or daily prestart if present?<br>
-
Floor area of plant (basket) clear to prevents trips and falls?<br>
-
Operators manual held with the plant for easy access?
-
Plant is not operating with identified defects on the checklist?
Penetrations.
-
All penetrations have been covered with a suitable cover that is secured against dislodgment. Penetration covers are clearly marked “Warning hole below” or words to a similar effect?
-
Penetrations are barricaded where securing has been released for access?
Edge Protection.
-
Mesh guards fitted and secured?<br>
-
Toe-boards or mesh guard (where fitted) in close contact with the floor or platform level?
-
Check for sturdiness and secured components, including supporting structure?<br>
-
Edge barricades back 1.8m from edges (Formwork live edge protection etc)?
Hazardous Manual Tasks.
-
Workers avoiding twisting and lifting (Particularly over chest height)?
Hazardous Chemicals.
-
Material Safety Data Sheets (MSDS) register is readily available for all MSDS brought to site and MSDS are current (5 years from issue date)?<br>
-
Has a “Risk Assessment” been completed for each Hazardous/Dangerous goods on site?<br>
-
Are all chemical containers, including decanted containers, labeled appropriately?
-
Emergency spill response equipment (yellow bin/spill kit) is on site and full inventory is available?
Crane Activities - Including Excavators used for Crane Work.
-
Overhead services clear of lift zone, is electrical spotter required (works in 3m exclusion zone)?
-
Excavators/Backhoes used in crane mode have anti-burst devices fitted, an “SWL” marked on the dipper arm and an “appropriate” load chart in the operator’s cabin?
-
Is all lifting gear tagged, current, stored appropriately and in good condition (hooks fitted with safety latches)?
-
Are lift plans available for lifts of a complex nature?
-
Is the crane Fit for Purpose (suitable for the proposed lift)?
Material Storage.
-
No materials stacked in front of water coolers, power boards, fire extinguishers or fire exits?<br><br>
-
Access ways are kept clear?<br>
-
Clear access to storage location?
-
Are storage locations designated and advised to all PCBU's?
Non-Conformances
Recommendations.
Sign off - fgf personnel
-
Note: Present audit findings to Project Team and sign off.
-
Additional comments by personnel conducting audit.
-
Name and Site Role of fgf personnel conducting audit.
Sign off - Project Manager or Site Foreman.
-
Name, position and signature of PM or SM
-
PM or SM comments