Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Quality Plan
-
1.1. Has a Quality Plan been completed for the project/work (check date issued)?
-
1.2. Have Construction Procedures been included for the project?
-
1.3. Are ITP's included in the plan for the works?
-
1.4. Is a Lot Register included in the Plan and have lots been established?
-
1.5. Is there a Test Request book available and is it being used?
-
1.6. Is there Non-conformance Report Forms available in the Plan?
-
1.7. Have Construction Drawings been issued for the project?
-
1.8. Are Dumpy Levels/ Laser Levels in calibration?
2. Construction Procedure
-
2.1. Have Construction Procedures been compiled and are relevant to the works being undertaken?
-
2.2. Have the Construction Procedures been compiled as per the relevant specifications e.g. DTMR, CRC?
3. Inspection Test Plan (ITP)
-
3.1. Are the work process and associated inspection and test points included in the ITP?<br>
-
3.2. Are allocations for responsibility for inspections and testing included in the ITP?
-
3.3. Are the relevant Test Methods and Testing Frequency included?
-
3.4. Have the relevant Witness and Hold Points as per the specification been included?
-
3.5. Have the appropriate signs offs for Hold and Witness points occurred e.g. Client's Representative, Project Manager etc?
4. Lot Register
-
4.1. Is the Lot Number recorded as per the Quality Plan?<br>
-
4.2. Is the Lot Description and Location recorded?<br>
5. Test Requests
-
5.1. Have Test Requests been issued for the required testing as per the ITP?
-
5.2. Have preliminary/actual test results been received for testing completed?
6. Non-Conformance Reports (NCR's)
-
6.1. Have there been any NCR's raised?
-
6.2. Have proposed corrective actions been approved by the Client? (Where required)<br>
-
6.3. Have corrective actions been implemented?<br>
7. Construction Drawings
-
7.1. Are Construction Drawings current as per the distribution register?
-
7.2. Have all construction drawings been issued to relevant staff, including Sub-contractors?
Non-conformances
Recommendations
Sign off - fgf Personnel
-
Note: Present audit findings to Project Team and sign off.
-
Additional comments by fgf personnel conducting audit.
-
Additional sketch area for fgf personnel conducting audit.
-
Name and Role of fgf personnel conducting audit.
Sign off - Project Manager or Site Foreman
-
Name and signature of Project Manager.
-
Project Manager comments.
-
Name and signature of Site Foreman.
-
Site Foreman comments.