Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Quality Plan

  • 1.1. Has a Quality Plan been completed for the project/work (check date issued)?

  • 1.2. Have Construction Procedures been included for the project?

  • 1.3. Are ITP's included in the plan for the works?

  • 1.4. Is a Lot Register included in the Plan and have lots been established?

  • 1.5. Is there a Test Request book available and is it being used?

  • 1.6. Is there Non-conformance Report Forms available in the Plan?

  • 1.7. Have Construction Drawings been issued for the project?

  • 1.8. Are Dumpy Levels/ Laser Levels in calibration?

2. Construction Procedure

  • 2.1. Have Construction Procedures been compiled and are relevant to the works being undertaken?

  • 2.2. Have the Construction Procedures been compiled as per the relevant specifications e.g. DTMR, CRC?

3. Inspection Test Plan (ITP)

  • 3.1. Are the work process and associated inspection and test points included in the ITP?<br>

  • 3.2. Are allocations for responsibility for inspections and testing included in the ITP?

  • 3.3. Are the relevant Test Methods and Testing Frequency included?

  • 3.4. Have the relevant Witness and Hold Points as per the specification been included?

  • 3.5. Have the appropriate signs offs for Hold and Witness points occurred e.g. Client's Representative, Project Manager etc?

4. Lot Register

  • 4.1. Is the Lot Number recorded as per the Quality Plan?<br>

  • 4.2. Is the Lot Description and Location recorded?<br>

5. Test Requests

  • 5.1. Have Test Requests been issued for the required testing as per the ITP?

  • 5.2. Have preliminary/actual test results been received for testing completed?

6. Non-Conformance Reports (NCR's)

  • 6.1. Have there been any NCR's raised?

  • 6.2. Have proposed corrective actions been approved by the Client? (Where required)<br>

  • 6.3. Have corrective actions been implemented?<br>

7. Construction Drawings

  • 7.1. Are Construction Drawings current as per the distribution register?

  • 7.2. Have all construction drawings been issued to relevant staff, including Sub-contractors?

Non-conformances

Recommendations

Sign off - fgf Personnel

  • Note: Present audit findings to Project Team and sign off.

  • Additional comments by fgf personnel conducting audit.

  • Additional sketch area for fgf personnel conducting audit.

  • Name and Role of fgf personnel conducting audit.

Sign off - Project Manager or Site Foreman

  • Name and signature of Project Manager.

  • Project Manager comments.

  • Name and signature of Site Foreman.

  • Site Foreman comments.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.