Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Environmental Management Plan
-
Note: Consult with both workers and Subcontractors to see if they understand their requirements to report Environmental Incidents/Issues/concerns.
-
1.1. Is there an Environmental Management Plan for the project (Check that it is signed and dated).
-
1.2. Have all staff undertaken the Environmental Induction for the site.
-
1.3. Have weekly inspections been completed for the site as stated in the Environmental Management Plan.
2. Noise
-
2.1. Nuisance or disturbance noise from site activities is being kept to a minimum and such work that causes such noise is only being conducted during Council approved hours.
-
2.2. All equipment has been effectively muffled.
-
2.3. No noise or vibration complaints have been received.
3. Impacts on Water Quality
-
3.1. Storm water run off from site is controlled.<br><br>
-
3.2. Concrete trucks/pump wash-out location in place and identified.<br>
-
3.3. Earthen batters have silt protection fitted.
-
3.4. Stockpiles have silt protection fitted.
4. Air Quality
-
4.1. Plant & Equipment exhaust emissions minimised by ensuring maintenance is undertaken at nominated periods.<br><br>
-
4.2. Dust generation has been minimised by having water truck available.
-
4.3. Roads have been watered to control dust and stockpiles and truckloads covered, as necessary.
-
4.4. There has been no burning of waste on site.
5. Erosion and Sediment Control
-
5.1. Are erosion and sediment control devices in place prior to excavation works commencing on site.<br><br>
-
5.2. Erosion and sediment control devices have been checked and maintained following major rain events.<br>
-
5.3. Storm water/kerb inlet pits have protection fitted (on & off site) and serviced after rain events.
-
5.4. Is kerb side turf in place to slow the speed of water and trap sediment from entering kerb.
-
5.5. Construction has not taken place during heavy rain.
-
5.6. Temporary stockpiles (exposed for more than 14 days) have been grassed or have sediment fence on the downslope side.
6. Cultural Heritage
-
6.1. If identified, protection and notification methods are being followed as per Environmental Management Plan.<br>
7. Chemical Storage
-
7.1. Spillage bunds suitable to materials and quantity being stored (110% largest container).<br><br>
-
7.2. Material Safety Data Sheet (MSDS) register is readily available and MSDS are current.
-
7.3. Emergency spill response equipment (Yellow bin/spill kit) is on site and full inventory is available.
-
7.4. Fire fighting equipment is readily available on site (near storage locations) and has been inspected and in date.<br>
-
7.5. Only compatible substances stored adjacent to each other – See Hazardous Substances storage guide.
8. Site Access
-
8.1. Rock shaker grid in place at site entrance/exit.<br>
-
8.2. Public roadways/footpaths clear of sediment.<br><br>
-
8.3. Rock shaker grid is not full of sediment/adequate voids to be effective and trap sediment.
9. Flora & Fauna
-
9.1. Extent of clearing has been delineated using markers (no over clearing).<br>
-
9.2. Ground cover maintained where possible for future placement in completed areas.<br>
-
9.3. All cleared trees have been mulched or disposed as approved by the Superintendent (no unauthorised felling or removal of vegetation).
-
9.4. No domestic animals present on site (construction staff bring pets to site).
-
9.5. No damage to surrounding vegetation during construction (excess soil/rocks placed around base of trees or vehicles going off formed tracks).
10. Vibration
-
10.1. Vibration from site activities is being kept to a minimum and such work that causes vibration is only being conducted during approved construction hours.<br>
-
10.2. Damage to adjoining properties & utility services is being avoided (dilapidation inspection required).<br><br>
11. Waste Management
-
11.1. General litter, (food containers, plastic wrap, grease canisters) controlled via closed top bins/bags and emptied daily.<br>
-
11.2. General building waste contained and prevented from unintended release.<br>
-
11.3. Quantities of materials on site has been minimised to reduce waste generation.<br>
-
11.4. Materials to be recycled are identified and segregated from waste material.<br><br>
12. Fueling and Maintenance
-
12.1. There has been no major vehicle maintenance conducted on site (daily per-start maintenance permitted).<br>
-
12.2. Refueling has only been undertaken in designated areas.<br>
-
12.3. Spills or leakage of any fuel stores have been fixed and remediated and absorbent materials in supply.
-
12.4. No empty grease cartridges left laying around.
Non-conformances
Recommendations
Sign off - fgf Personnel
-
Note: Present audit findings to Project Team and sign off.
-
Additional comments by personnel conducting audit.
-
Name and Role of fgf personnel conducting audit.
Sign off - Project Manager or Site Foreman
-
Name and signature of Project Manager.
-
Project Manager comments.
-
Name and signature of Site Foreman.
-
Site Foreman comments.