Integrated Project Management Plans (IPMP).
-
Is there an IPMP available on site for the works?
-
Have Construction Procedures been included in the IPMP. Are Bitumen spray sheets/Asphalt sheets on site?
-
Are incident/NCR books available? (Check to see if any completed for HSEQ, and have been added to the FIXIT Diary and appropriate actions taken to close out).
-
Daily Risk Assessments completed for the job and all staff made aware of hazards. (Electrical Spotter Required)?
-
Have all staff signed onto the site induction.
Construction Site Entry.
-
Is access adequate, safe and not posing problems for workers and general public?
PPE Compliance.
-
All mandatory PPE is being worn by all personnel. (Long pants, long sleeved shirts with sleeves rolled down)
-
Additional PPE is being worn as acknowledged on SWMS or SDS (if applicable).
Mobile Plant.
-
Pre start check has been completed and documented including Subcontractor Plant.
-
Operator Competent to operate machine / VOC Completed.
-
Warning lights and reversing beepers operating and all anti-slip surfaces in good condition?
Emergency Equipment.
-
Are emergency water extinguishers (for Bitumen Burns) full of water and charged.
-
Are Fire Extinguishers in test date and easily accessible.
-
First-aid kits available and stocked with correct equipment.
-
Are spill kits available on site?
HouseKeeping.
-
All rubbish removed from work area and placed in waste pile / bin. (Tar paper)
-
Work areas clean and tidy at completion of works.
Hazardous Substances.
-
Are SDS sheets and register on site for all chemicals in use.
-
Chemicals clearly labelled and in approved containers.
General Safety.
-
Have SWMS has been completed for the tasks on site, including Subcontractor activities?
-
Underground / Overhead services identified and where required protected from damage. (Electrical Spotter Required)?
-
Guarding in place on equipment.
Environmental (Fuelling and Maintenance).
-
Refuelling has only been undertaken in designated areas away from waterways and drains?
-
Spills or leakage of any fuel stores have been fixed and remediated and absorbent materials restocked?
Traffic Management.
-
Is a traffic guidance scheme in place with signage setup as per the scheme?
-
Has pedestrian traffic been considered (where required)?
-
Do Traffic Controllers on site have traffic control licences?
-
Is road and pedestrian signage located correctly, clean, visible and effective (is traffic following signage)?
fgf FIXIT Raised.
Date FIXIT Closed-Out:
Comments.
-
Signature