Title Page

  • Site conducted

  • Project Name

  • Inspection Date and TIme

  • Name of project team management to accompany HSEQ Department on audit.

  • Audit No.

  • Location
  • This report records the findings of the HSEQ Audit/Inspection of the above site.<br><br>NB: Have all action items from the previous audit been closed out?

  • Was the weekly HSEQ submission form recieved for the previous week?

  • Was the project statistics form recieved for the previous week?

SITE AUDIT REPORT

SAFETY MONITORING

  • 1. Site Safety Competent & C-19 Compliance Officer/s Person clearly defined for site?

  • 2. P.P.E. being used correctly and compliant with the manufacturers usage directions? PPE locked in a secure location, issuing forms completed by issuer?

  • 3. Have all employees / sub contractors completed the Kilwex Ltd, Client and or PSCS site specific inductions? Competency of operators checked by site supervision prior to commencement of works?

  • 4. Have all employees/sub contractors been briefed, read and signed the Company Safety Statement and or CSHP?

  • 5. Have all employees/sub contractors been briefed on the project RAMS? Have they read and signed acceptance thereof?

  • 6. Have all sub contractors submitted training certificates been reviewed and uploaded to Union Square?

  • 7. Copies of all RAMS available in the work area, or in a file for ease of access by all project members?

  • 8. Is the Kilwex Ltd HSE File being maintained weekly by site supervision, employees training records, registers, GA1’s, GA2’s & GA3’s,Inspections, etc. and uploaded to Union Square?

  • 9. Are all required safety signs(Warning, Prohibitory & Information) prominently displayed on sites and offices?

  • 10. Are Client identification cards/badges visible and names on hard hats. (If Applicable)?

  • 11. Are all fire extinguishers(Site & Vehicle) inspected with the past six months and in place in all designated locations?

  • 12. Check records of permit to work systems, completed, authorised by Kilwex Ltd and Client/PSCS and closed out at the end of each day/shift?

  • 13. Is a daily white board meeting taking place on site?

  • 14. Kilwex Ltd employees & Subcontractors training up to date, dipstick testing completed, and training verified?

  • 15. Two fire extinguishers(CO² & Powder) and fire blanket in place for all Hot Works?

  • 16. Kilwex Ltd and subcontractor’s housekeeping/storage maintained to high standard?

  • 17. 'Clean as you go' Policy' being adhered to?

  • 18. Emergency plans in place and relevant drills completed monthly?

  • 19. AF3 completed for all excavations?

  • 20. All excavation shoring, battering and edge protection in place?

  • 21. All Excavations have barriers & warning signage in place to prevent unauthorised entry?

  • 22. Do all excavations have a safe method of access & egress?

  • 23. Onsite traffic management plan in place to ensure safe segregation of pedestrian and site vehicles?

  • 24. Have exclusion zones been created within the project zone & the relevant signage attached?

  • 25. All OPE's, Manholes, etc. covered and protected sufficiently? With a load or non load bearing sign attached, where applicable?

  • 26. Daily SPA's completed by all crews?

  • 27. Fixed scaffolding inspected within the last 7 days and signed off by a CSCS Scaffolder, handover and inspection sheets uploaded to U.S.?

  • 28. All Straight & Access ladders into excavations in good working order and tag signed off within the last 7 days?

  • 29. All Mobile Aluminum Access Towers erected as per manufacturers instructions by a CSCS competent person and tag signed off within the last 7 days?

  • 30. Have all Slip, Trip and Fall hazards been identified and mitigated?

  • 31. Have all areas where water accumulation occurs been pumped out?

  • 32. All rebar capped?

  • 33. Access & Egress to Client/Site emergency exits and or routes maintained and clear?

  • 34. All Site Perimeter fencing and gates secured?

ENVIRONMENTAL MONITORING

  • 1. Are all hazardous substances on site containers marked as per CLP Regulations and are containers maintained and stored correctly?

  • 2. Is the Hazardous storage unit indicated marked with approved Kilwex Ltd Signage?

  • 3. Is the hazardous substance SDS register up to date and? Have all SDS's been uploaded to Union Square?

  • 4. Spill kits strategically placed across the site and within all Site vehicles/Plant where applicable?

  • 5. Colour coded recycling bins placed in designated locations with signage attached to identify each waste stream?

  • 7. Is all hazardous & Inert waste been disposed of correctly and recorded within the waste register and written transfer notes uploaded to U.S.?

  • 8. Have there been any hazardous spills/leaks or evidence thereof from any plant and equipment, fuel drums etc., or other spills? If so was a Kilwex Ltd. Spill report completed on IMS_E060?

  • 9. Has of the Appointed waste removal company's license been uploaded to Union Square?

  • 10. Welfare facilities free from water leaks?

  • 11. Evidence of spill mats being used during refueling activities?

HEALTH & WELFARE MONITORING

  • 1. All employees & subcontractors observing COVID 19 safety protocols as per HSE/WHO/CIF Guidance?

  • 2. Are Kilwex Ltd activities that generate dust or fumes controlled to eliminate or reduce the risk to exposure?

  • 3. RPE worn by all Kilwex Ltd and subcontractors as required?

  • 4. Are there clearly visible and legible signs indicating that the noise level in the area is likely to exceed 85dBA?

  • 5. Canteens, drying, toilets adequate with heat, lighting, bins in areas and maintained to acceptable standard and complying with HSE C-19 guidelines?

  • 6. Is drinking water freely available across the site?

  • 7. Adequate number of First Aid Responders and first aid equipment stocks replenished?

  • 8. Health Hazards - Asbestos, Dust & Silica, Noise, Vibration, Biological, Stress and Fatigue managed across the site?

QUALITY MONITORING

  • 1. Has the project Quality plan in place and uploaded to U.S.?

  • 2. Are scheduled Quality audits being completed and uploaded to U.S.?

  • 3. Equipment requiring calibration – calibration tag, sticker and certificate is current?

  • 4. Appropriate hand/Insulated tools used by all Kilwex Ltd and subcontractors?

  • 5. Materials/equipment is stored in clean/ dry location and not stored in the same containers?

  • 6. Quarantine area is set up, verify non-conformance reports issued for any materials/Equipment?

  • 7. All Kilwex Ltd site plant/vehicles plant GA2's completed manually or via Assetminder daily?

SIGN OFF

  • EHS DEPARTMENT (Name and Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.