Title Page
-
Taff's Well Depot
-
Conducted on
-
Prepared by
-
Location
undefined
-
CDM 2015
-
Has the Account Director completed an annual CDM audit (Amey - HS-CDM-FO-18)?
-
Principal Designer Appointed?
-
Has the nominated PC lead for the account visited the project and met with the person who is delivering the PC role on the project - (Amey-HS-CDM-FO-17)?
-
Has the Project Principal Designer (while design work is ongoing) and Project Principal Contractor (while construction work is ongoing) carried out a Designer - Contractor (Monthly) check - (Amey-HS-CDM-FO-15)?
-
Appropriate signage displayed Principal Contractor License (PCL), Insurance certificates, safety signs etc?
-
F10 HSE Notification displayed?
-
Paper copy of the Construction Phase Health, Safety Plan (CPP) present on site having formally been issued through document control?
-
CDM area clearly defined on site drawing and displayed?
-
Suitable security arrangements in place to prevent unauthorised access to CDM area?
-
Employee / Contractor personal details form completed?
-
Individual in charge of the site suitably authorised / qualified? (PC Representative, where applicable)
-
Project induction delivered to all personnel involved within the project?
-
Induction register and records maintained?
-
Site attendance log maintained?
-
Adequate welfare facilities for the number of people on site, as required by CDM 2015?
-
Welfare facilities maintained in a clean and tidy condition with suitable heating and lighting?
-
Adequate water supply for both general use and drinking?
-