Page 1: Initial questions
-
Document Number
Project
-
Project Number
-
Conducted on
-
Client
-
Site
-
Project Manager
-
Site Manager
-
Auditor
-
LSP
RAMS/Induction
-
Was a site Induction carried out
-
Have suitable measures been taken to ensure operatives are aware of site rules / safety procedures etc
-
Are there any non conformances relating to the use of USS references
-
Are RAMS suitable for the job - they cover the work that being undertaken including commissioning
-
What needs to be improved
- Risk assessment does not cover risks at site
- Scope is inadequate
- SSOW does not cover works
-
Are RAMS signed by the operatives currently on site
- some operatives have signed the RAMS
- All operatives present have signed the RAMS
- No evidence that anyone has signed the RAMS
Project Folder Audit Pre Visit
-
RAMS - In date and reviewed
-
Quote to client in folder
-
PO from Client in project folder
-
PO to LSP in project folder
-
PO for equipment
-
RAMS signed by site operatives and available in the project folder
-
Operatives site competencies in project folder
-
Induction to site evidence in folder
-
Plant pre use checks documented in the folder
-
Overall is the HSEQIS Folder compliant to Convergint standards
Name of Engineers on site and competency
-
Name of Engineer
-
Does the engineer have the correct certificates ECS/CSCS and any others required IPAF etc
-
There is evidence of certification in the project folder for this operative
- Yes
- No
- There is evidence but it is out of date
- Some certificates are present but no evidence of CSCS/ECS
Work at Height
-
Is work at height occurring
-
What type of access equipment is being used
- Stepladders
- ladders
- Scissor lift
- Cherry picker
- PECO/ ECO
- Mobile Scaffold
- Podium
- Hop up
-
Is the stepladder tagged and inspected
-
Is the ladder tagged and inspected
-
Does the scissor lift have a LOLER certificate and are checks being carried out and documented
-
Does the MEWP have an in date LOLER (UP TO 6 MONTHS) are pre use chscks being carried out and documented
-
Does the PECO/ECO have an in date LOLER cert (under 6 months) and are pre use checks being carried out and documented
-
Was the mobile scaffold assembled by an PASMA certified operative and are pre use check being carried out and documented
-
Is the access equipment the right type for the work
- No the work requires a different type of access equipment
- Yes
-
Is work at height above 2 meters
-
The control hierarchy should be implemented please list what is in place
- Avoid working at height - so far as is reasonably practicable work should be conducted at ground level;
- Prevent falls – where working at height cannot be avoided, prevent falls using an existing safe place of work or use the correct type of equipment. A safe place of work may need to be created if none exists (e.g. using temporary guard rails around a roof, or by providing a correctly constructed scaffold);
- Minimise the distance and consequence of a fall - so far as is reasonably practicable, to provide the right type of work equipment to minimise the distance and consequences of a fall. (e.g. the distance that a person can fall can be reduced with safety nets or fall arrest systems);
- Reduce duration time spent required to be at height - co-ordination of maintenance needs can combine several small maintenance jobs together; and
- Training and instruction - ensure where working at height is undertaken that all such work is to be appropriately planned (including selection of work equipment) and supervised and that this work is conducted by suitable and sufficiently competent personnel.
-
Do the engineers have the right competency to carry out the work at height using the access equipment available
Maglocks
-
Are maglocks installed or being on site
-
Are Maglocks being installed with safety straps on both the armature and the plates
-
Has there been explicit written instructions from the client to not install the straps
-
Is threadlock being applied to all fixings
-
Has the installation standard been effectively communicated to the install team both in the RAMS and verbally
Work Environment
-
PTW
-
Does the work require this additional safety process to be implemented
-
Are local and environmental factors given consideration
-
Are there any aspects of the work or the working environment that you feel could be considered unsafe
-
Dust production present
-
Other
Signage & Barriers
-
Are they available and in use where required
-
Are they the right type of barriers & signage for the environment and work
-
Are they labelled with Convergint and a site contact name number?
- Yes they are clearly labelled
- No this should be done to ensure clarity on ownership
- They have some identification but this could be clearer
- n/a
Work Equipment
-
Right tools for the task
-
Work equipment is kept in a lockable site box
-
Site box is clearly labelled with company and site contact name and number
- Yes they are clearly labelled
- No this should be done to ensure clarity on ownership
- They have some identification but this could be clearer
- n/a
-
PAT testing on electrical equipment has been carried out with in date stickers displayed
-
Where are tools stored
Housekeeping
-
Are high standards of housekeeping being implemented
-
Are all tools & equipment stored out of walkways and do not pose a slip trip and fall hazard
-
Do the engineers have a storage area to ensure tools equipment etc can be secured at the end of the day
COSHH
-
Are COSHH articles used on site?
-
Are they stored and used correctly
Welfare facilities
-
Are there adequate sanitary faclities
-
Is there somewhere that the engineers can make hot food and drink
Waste disposal
-
What are the protocols for disposing of waste at site
-
Are waste transfer notes in use where required
-
Are these in the project Folder
PPE
-
Are operatives wearing the correct PPE
- Hard hat
- Hi Vis
- Boots
- Safety glasses
- Gloves
- Other
Health and Safety training
-
Do engineers have Asbestos training
- Asbestos is not required for this project
- Building has asbestos and the workers do not have asbestos training
- Workers have basic asbestos but are required to hold UKATA
- Workers hold the right training
-
Do the engineers have other health and safety training
- Yes they have H&S training
- No they do not have any health and safety training
-
Health and Safety challenges for the project.
-
Evidence/signs of forced labour
-
H&S Rating given on LSP Smartsheet
Page 2: Non Conformances (findings)
-
Non Conformance (Findings that require action)
-
Root Cause (underlying reason for non conformance)
- Complacency
- lack of training
- Restrictions of access to SharePoint
- Other
-
Corrective action and accountability (what needs to be actioned & by who)
-
Proposed Completion date
-
Action completion date
-
Any actions not completed please give reasons why (these may be shared with line management for any lessons learnt)