Page 1: Initial questions

  • Document Number

Project

  • Project Number

  • Conducted on

  • Client

  • Site

  • Project Manager

  • Site Manager

  • Auditor

  • LSP

RAMS/Induction

  • Was a site Induction carried out

  • Have suitable measures been taken to ensure operatives are aware of site rules / safety procedures etc

  • Are there any non conformances relating to the use of USS references

  • Are RAMS suitable for the job - they cover the work that being undertaken including commissioning

  • What needs to be improved

  • Are RAMS signed by the operatives currently on site

Project Folder Audit Pre Visit

  • RAMS - In date and reviewed

  • Quote to client in folder

  • PO from Client in project folder

  • PO to LSP in project folder

  • PO for equipment

  • RAMS signed by site operatives and available in the project folder

  • Operatives site competencies in project folder

  • Induction to site evidence in folder

  • Plant pre use checks documented in the folder

  • Overall is the HSEQIS Folder compliant to Convergint standards

  • Name of Engineers on site and competency
  • Name of Engineer

  • Does the engineer have the correct certificates ECS/CSCS and any others required IPAF etc

  • There is evidence of certification in the project folder for this operative

Work at Height

  • Is work at height occurring

  • What type of access equipment is being used

  • Is the stepladder tagged and inspected

  • Is the ladder tagged and inspected

  • Does the scissor lift have a LOLER certificate and are checks being carried out and documented

  • Does the MEWP have an in date LOLER (UP TO 6 MONTHS) are pre use chscks being carried out and documented

  • Does the PECO/ECO have an in date LOLER cert (under 6 months) and are pre use checks being carried out and documented

  • Was the mobile scaffold assembled by an PASMA certified operative and are pre use check being carried out and documented

  • Is the access equipment the right type for the work

  • Is work at height above 2 meters

  • The control hierarchy should be implemented please list what is in place

  • Do the engineers have the right competency to carry out the work at height using the access equipment available

Maglocks

  • Are maglocks installed or being on site

  • Are Maglocks being installed with safety straps on both the armature and the plates

  • Has there been explicit written instructions from the client to not install the straps

  • Is threadlock being applied to all fixings

  • Has the installation standard been effectively communicated to the install team both in the RAMS and verbally

Work Environment

  • PTW

  • Does the work require this additional safety process to be implemented

  • Are local and environmental factors given consideration

  • Are there any aspects of the work or the working environment that you feel could be considered unsafe

  • Dust production present

  • Other

Signage & Barriers

  • Are they available and in use where required

  • Are they the right type of barriers & signage for the environment and work

  • Are they labelled with Convergint and a site contact name number?

Work Equipment

  • Right tools for the task

  • Work equipment is kept in a lockable site box

  • Site box is clearly labelled with company and site contact name and number

  • PAT testing on electrical equipment has been carried out with in date stickers displayed

  • Where are tools stored

Housekeeping

  • Are high standards of housekeeping being implemented

  • Are all tools & equipment stored out of walkways and do not pose a slip trip and fall hazard

  • Do the engineers have a storage area to ensure tools equipment etc can be secured at the end of the day

COSHH

  • Are COSHH articles used on site?

  • Are they stored and used correctly

Welfare facilities

  • Are there adequate sanitary faclities

  • Is there somewhere that the engineers can make hot food and drink

Waste disposal

  • What are the protocols for disposing of waste at site

  • Are waste transfer notes in use where required

  • Are these in the project Folder

PPE

  • Are operatives wearing the correct PPE

Health and Safety training

  • Do engineers have Asbestos training

  • Do the engineers have other health and safety training

  • Health and Safety challenges for the project.

  • Evidence/signs of forced labour

  • H&S Rating given on LSP Smartsheet

Page 2: Non Conformances (findings)

  • Non Conformance (Findings that require action)

  • Root Cause (underlying reason for non conformance)

  • Corrective action and accountability (what needs to be actioned & by who)

  • Proposed Completion date

  • Action completion date

  • Any actions not completed please give reasons why (these may be shared with line management for any lessons learnt)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.