Title Page
-
Site
-
Carried Out By
-
Location
-
DWG Ref:
-
Date
-
Type of Kerbs:
-
Cover Level:
-
Brief Task Description
Sketch/Plan of Kerbs
-
(IC = Internal Corner & EC = External Corner, R= Radius, DK= Drop Kerbs, CK = Channel Kerb, TK= Transition Kerb)
-
Sketch/Plan of Kerbs
-
Alignment Accepted
-
Levels Accepted
-
Joints/ Radius Accepted
-
Concrete Backing
-
Depth to Surface
-
Snagging Required for Above
-
All Snagging Rectified and all items / Installation Accepted
-
Signed on behalf of Client
-
Signed on Behalf of MTG