Title Page
-
Contract No.
-
Date
Checks Prior to Commencement of Laying
-
1. Condition of laying surface:
-
2. Set levels of each course:
- SB
- RB
- BC
-
3. Existing Surface Levels:
- AV.LOW
- AV.High
- O.K.
-
4. Record air temperature (a.m) C
-
4. Record air temperature (p.m) C
-
5.Record weather conditions (throughout day)
-
6. Site dilapidations (kerbs etc)
-
7. Plant Checks Completed
- Roller
- Bob Cat
- Paver
-
ALL DEFECTS TO BE RECORDED ONTO DEFECTS SHEET IMMEDIATLEY AND REPORTED TO SUPERVISOR
Checks During Progress of Works
-
1. Material Inspection: Is it as ordered (if not contact management immediately)
2. Material Temperature Check
-
Material
-
Ticket No.
-
Del Temp
-
Laying Temp
-
3. Level Control During Laying
- NA
- SB
- RB
- BC
- WC
-
4. Level Dig Each Completed Layer
- NA
- SB
- RB
- BC
- WC
-
5. Binder/Tack Coat
CHECKS ON COMPLETION OF WORKS
1. Final Surface/Site Check
-
Visual Inspection
-
Level Check
-
Falls Check - Flood with Water
2. Housekeeping Check
-
Any Damage
-
Site Cleanliness
-
3. Plant Check
- Cleaned
- Greased
- Serviceable
- Sheeted
-
Foremans Signature
-
Passed By
-
Comments
-
Non Conformance Report Details
-
Additional Works
-
Signed on Behalf of Client