Title Page
-
Site conducted
-
Carried Out By
-
Date
-
Location
-
DWG No.
-
Task Description
-
Excavated to correct formation
- Checked by Moortown
- Checked by others
- N/A
-
Service runs complete and taped
- Checked by Moortown
- Checked by others
- N/A
-
Backfilled and compacted
- Checked by Moortown
- Checked by others
- N/A
-
Check sub-base material as specified
- Checked by Moortown
- Checked by others
- N/A
-
CBR's Taken?
- Checked by Moortown
- Checked by others
- N/A
-
Terram (or similar) Required
- Checked by Moortown
- Checked by others
- N/A
-
Check sub-base laid and compacted as specified
- Checked by Moortown
- Checked by others
- N/A
-
Check type 1 levels as detailed
- Checked by Moortown
- Checked by others
- N/A
-
Check intermediate thickness and levels
- Checked by Moortown
- Checked by others
- N/A
-
Manhole lids, gullies tops & Aco's installed
- Checked by Moortown
- Checked by others
- N/A
-
Stone to correct level
- Checked by Moortown
- Checked by others
- N/A
-
Kerbs and edgings complete
- Checked by Moortown
- Checked by others
- N/A
-
Check base course for damage
- Checked by Moortown
- Checked by others
- N/A
-
Check wearing course for damage
- Checked by Moortown
- Checked by others
- N/A
-
Snagging Required for Above
-
Notes ( Weather conditions on the day etc)
Tarmac contractor acceptance
-
I accept that this area has been constructed and checked as per the above table
Tarmac Accepted
-
Signed on behalf of Client
-
Signed on behalf of MTG
All Snagging Rectified and all items Acceptable
-
Signed on behalf of Client
-
Signed on Behalf of MTG