Title Page

  • Site conducted

  • Carried Out By

  • Date

  • Location

  • DWG No.

  • Task Description

  • Excavated to correct formation

  • Service runs complete and taped

  • Backfilled and compacted

  • Check sub-base material as specified

  • CBR's Taken?

  • Terram (or similar) Required

  • Check sub-base laid and compacted as specified

  • Check type 1 levels as detailed

  • Check intermediate thickness and levels

  • Manhole lids, gullies tops & Aco's installed

  • Stone to correct level

  • Kerbs and edgings complete

  • Check base course for damage

  • Check wearing course for damage

  • Snagging Required for Above

  • Notes ( Weather conditions on the day etc)

Tarmac contractor acceptance

  • I accept that this area has been constructed and checked as per the above table

Tarmac Accepted

  • Signed on behalf of Client

  • Signed on behalf of MTG

All Snagging Rectified and all items Acceptable

  • Signed on behalf of Client

  • Signed on Behalf of MTG

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.