Title Page

  • Site conducted

  • Location
  • Conducted on

  • Prepared by

  • Signature

Outside Area and Security Gate

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Non and Hazardous Waste Area

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Utilities / Maintenance

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Cheamical Storage

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Production Area

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Cylinder making and Plate making

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Ink / Laquer production / Print Washing Machine

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

Logistic and Warehouse

Safety

  • Personal safety equipment list availability and implementation (Hearing, Safety Glasses, Face Shields,Safety Shoes,Proper Uniform, Gloves etc).

  • Hazard conditions-pallets, debris, or sharp objects, trips, spills (water / oil), Cables are above the ground, not tied together, live ends not exposed or taped, adequately lighted.

  • Fire extinguishers, emergency showers, eye wash bottles and stations where required are present, marked, accessible and checklists are updated (where applicable).

  • Panels and cabinets are closed and locked.

  • Guarding / safety devices or procedures/alarm system/fire hydrand are in place and effectively used.

  • First aid boxes are available, adequately filled and in good condition.

  • Walkways and emergency exits are free, evacuation routes posted and understood.

  • Chemicals are correctly labelled, SOP for handling chemicals, MSDS is displayed. Lockout-Tagout procedures are followed.

  • Toolbox talks is conducted, improvement points generated and effective actions are taken.

  • Safe work practice (such as using hand rails, safety belts, safe material and equipment handling, using knives towards the body) are in place.

(1S) Sort

  • All machinery, handling equipment, tools, materials, gages and instrument are necessary and in use

  • All storage areas, racks, shelves, cupboards, WIP loations are necessary and are in use.

  • Red Tag area is identified and in use (frequency / time for doing Red Tag Activity is clear and is followed).

(2S) Set in order

  • All movable equipment, materials, parts and its location is marked labelled.

  • Layout of the area is available which shows the location of each item in the area.

  • Interior area of all cupboards and storage locations marked and labelled including contents

  • Corridors and walkways are demarcated and marked

  • Tools ( in case of office its stationary) have shadow boards / point of use.

  • Each object/ tool/ material are kept on their marked position (practice / behaviour). Yellow line and layout is respected

(3S) Shine

  • All floors & Ceiling are free from dust, dirt, debris, inks, oil, parts, hardware, packaging material, walls, windows, ducts, stripcurtains, overhead lamps and fixtures etc are clean.

  • Equipment (including material handling equipment and tools) and work stations(Area around the machine, behind the machines)is kept clean and free of oil, grease, dust and debris

  • All storage area (Cupboards,cabinets, WIP storage -racks, pallets) are free of dust, dirt and kept clean.

  • People keep themselves clean including uniform, shoes e.t.c

  • Evidence that when cleaning is taking place, the cleaner is looking for abnormalities

(4S) Standardize)

  • Cleaning schedules, frequency and standard method is defined and displayed

  • Standard work is defined and visually managed

  • Work environment such as temperature, light intensity (lux), sound level(decibel) should be maintained & displayed with standard and actual values

  • The graph of the audit & 5S radar is updated. Audit scheduling, audit results (with observation) and action plans are displayed

  • Post photographs of the "perfect" setup

(5S) Sustain

  • All associates are aware on 5S+S.

  • Evidence of sustaining and incremental improvement in audit score 'safety', 'sort', set-in-order', 'shine', 'standardize' (Average scoring for previous four consecutive audits)

  • Group can demonstrate retreival of needed items in 30 seconds

  • Evidence of action taken from previous 5S audit observations. Rootcauses are eliminated and improvement actions include prevention

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.