Documentation / Work Planning
-
Hazard Assessment <br>Properly completed and reviewed by workers
-
Line locates <br>Completed and valid?<br>All parties confirmation obtained?<br>Other parties notified?
-
A clear work plan review
-
Notification completed: Land owner, pipeline
Construction Package
-
Work package complete?<br>Site work, approvals, crossing agreements, site walk throughs.
-
Drawing details and notes reviewed?<br>Drawing notes accurate compared to Site layout ?
-
Site Walk through completed
-
Comments
PPE and Emergency Response
-
Safety footwear
-
F.R. Coveralls
-
Hard hat <br>check date issue replace 1 year
-
Hand protection
-
Eye Protection
-
Hearing protection
-
Condition of PPE
-
Fire extinguisher <br>Available / certified
-
SDS on site
-
Spill Response Kit<br>Response kit complete?
-
First-Aid Kit and blankets as required?
-
Contractors minimum PPE requirements are met?
-
Emergency Action Plan
-
Environmental concerns?
-
Comments
Traffic management signs
-
Proper sign placement<br>Traffic eliminated from work zones
-
Traffic cones and or barricades utilized?
-
Traffic control person certified?
-
Traffic control is effective for site
-
TMP on site
-
STMS and TC on site
-
Comments
Excavation
-
Hydrovac equipment inspection completed
-
Services exposed prior to excavation
-
-
Spotter in place around live services
-
Pipeline right of way or pipeline no right of way. <br>Controlled zone 30 M<br>Exposed prior - 5 M
-
Shoring / sloping/benching/trench shield
-
Safe entry and exits at 8 meter intervals
-
Spoil pile 1 meter away from excavation.
-
Proper depth achieved?
-
No plant equipment or materials stored at edge of excavation
-
Adequate separation from other services achieved?
-
Excavations left open are inspected prior to entry?
-
Stability of trench walls checked
-
Comments
-
Directional drilling
Directional drilling
-
Buried facilities exposed prior?
-
Crossing buried facilities at sight hole?
-
Adequate size reamer?<br>The pilot hole is to be reamed 1.5 times larger than the largest outside diameter (OD) of the pipe installed.
-
Weak link to spec.?<br>Conforms to pipe manufactures allowable pull back pressure spec?<br>
-
Double tracer wire required? Used?<br>Type and size as per drawing or spec?
-
Required depth achieved?
-
Pipe free of damage after bore complete?
-
Comments
Hydro Excavation
-
Water pressure: max 2000psi(13790 Kpa)<br>Water temp: max 180 F ( 82 C)
-
Noise warning signs placed?
-
PPE Utilized<br>
-
Continuous wand motion
-
Bonding and grounding completed before start up within 1 meter of power line?
-
Public kept away from Hydrovac?
-
Adequate protection of holes
-
Power company orientation
-
Hydrovac slurry disposal at approved site
-
Add media
-
Comments
-
Confined space / Restricted space
-
Backfill
Backfill
-
Trench free from objects?
-
Tracer wire installed no further than 15 cm
-
Proper pipe shading?
-
Back fill follows best practice requirements?
-
Proper tampers used?
-
Add media
-
Comments
Site securement
-
Equipment, materials secured and properly barricaded
-
Excavations properly fenced and barricaded?
-
Fenced excavations in close proximity of travelled areas clearly identified and marked with reflective capability for night time?
-
Pipe ends capped?
-
Flashing warning indicators working?
Action item
-
Action item
-
Complete by:
-
Assigned to:
-
Personal on site
-
Accepted by: