Information

  • Project Name

  • Conducted on

  • Location
  • Field Supervisor

  • Project Manager

  • Prepared by

JOBSITE SIGNAGE

  • Job Site Standards professionally posted

  • iConstructors tenant signage properly displayed

  • Fire Sprinkler Shutoff Valve properly labeled and identified

  • Water Shutoff Valves properly labeled and identified

PRESENTATION

  • iConstructors walk-off mats on-site and walk off mats used effectively

  • All common area including Lobbies and Corridors are spotless

  • Freight elevator clean including door tracks

  • Restrooms clean

  • Electrical & Mechanical Rooms are clean

  • Construction debris properly disposed and dumpster location free of all debris

JOB SITE PROTECTION

  • Plywood under wheels of dumpster, if on asphalt

  • Smoke detector protection properly installed

  • Filter media properly secured on all return air dampers and grills

  • Flooring/Wall/Millwork protection to iStandards

  • Existing mini-blinds raised or bagged to preclude dust accumulating on them during construction

  • iConstructors wall protectors properly utilized

  • Vacuum cleaner onsite and working

PERMIT BOARD

  • Permit board onsite and clean

  • Permit drawings inside permit board and permits posted neatly on permit board

  • First Aid Kit properly stocked and on-site

  • iConstructors Safety Manual on-site

  • All required SDS Sheets on-site for products|materials supplied by iConstructors

  • What SDS sheets are being used?

SAFETY

  • Fire extinguisher onsite and charged

  • Water properly provided for all job site personnel

  • All electrical power provided through OSHA approved GFI receptacles

  • All electrical cords used are safe and a minimum of 14 gauge wire

  • All job site personnel are wearing hard hats

  • Are there spare hard hats on site for Guests to utilize?

  • Proper, safe lighting provided throughout the job site

PLANGRID

  • Field Supervisor drawings are in PlanGrid and have been properly reviewed, annotated and color coded to reflect important notes, exceptions, concerns, and construction legend depiction

  • Field Supervisor drawings are utilizing iConstructors standard layers in PlanGrid.

  • PlanGrid layers utilized include:

  • RFI's and Submittals have been uploaded by the PM and the Field Supervisor has properly hyperlinked to the area they relate to

  • Work completed such as framing, wall devices, etc. has been generally verified for accuracy of location and existence by the Field Supervisor as depicted by a green dot on the object and assigned to the Verified layer

  • PlanGrid "Issues" are used to reflect punch-list and follow-up items. Each issue reflects room #, includes a photo, and description of the issue

  • As-Built drawings are being kept and updated regularly and assigned to the As-Built layer

ORGANIZATION

  • iConstructors storage container properly organized to accommodate fire sprinkler escutcheon caps & miscellaneous salvage materials

  • All salvaged material identified and properly stored to facilitate reuse

  • Job site materials are organized in a professional manner

  • Overall, job site is neat, orderly, and professional in appearance

  • PHOTOS

  • Comments

  • Person that completed the report

  • Add drawing

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.