Information
-
Project Name
-
Conducted on
-
Location
-
Field Supervisor
-
Project Manager
-
Prepared by
JOBSITE SIGNAGE
-
Job Site Standards professionally posted
-
iConstructors tenant signage properly displayed
-
Fire Sprinkler Shutoff Valve properly labeled and identified
-
Water Shutoff Valves properly labeled and identified
PRESENTATION
-
iConstructors walk-off mats on-site and walk off mats used effectively
-
All common area including Lobbies and Corridors are spotless
-
Freight elevator clean including door tracks
-
Restrooms clean
-
Electrical & Mechanical Rooms are clean
-
Construction debris properly disposed and dumpster location free of all debris
JOB SITE PROTECTION
-
Plywood under wheels of dumpster, if on asphalt
-
Smoke detector protection properly installed
-
Filter media properly secured on all return air dampers and grills
-
Flooring/Wall/Millwork protection to iStandards
-
Existing mini-blinds raised or bagged to preclude dust accumulating on them during construction
-
iConstructors wall protectors properly utilized
-
Vacuum cleaner onsite and working
PERMIT BOARD
-
Permit board onsite and clean
-
Permit drawings inside permit board and permits posted neatly on permit board
-
First Aid Kit properly stocked and on-site
-
iConstructors Safety Manual on-site
-
All required SDS Sheets on-site for products|materials supplied by iConstructors
-
What SDS sheets are being used?
- Cleaning Supplies
- Glue | Mastic
- Other
SAFETY
-
Fire extinguisher onsite and charged
-
Water properly provided for all job site personnel
-
All electrical power provided through OSHA approved GFI receptacles
-
All electrical cords used are safe and a minimum of 14 gauge wire
-
All job site personnel are wearing hard hats
-
Are there spare hard hats on site for Guests to utilize?
-
Proper, safe lighting provided throughout the job site
PLANGRID
-
Field Supervisor drawings are in PlanGrid and have been properly reviewed, annotated and color coded to reflect important notes, exceptions, concerns, and construction legend depiction
-
Field Supervisor drawings are utilizing iConstructors standard layers in PlanGrid.
-
PlanGrid layers utilized include:
- As-Built
- Rough-In
- Verified
- Existing Conditions
-
RFI's and Submittals have been uploaded by the PM and the Field Supervisor has properly hyperlinked to the area they relate to
-
Work completed such as framing, wall devices, etc. has been generally verified for accuracy of location and existence by the Field Supervisor as depicted by a green dot on the object and assigned to the Verified layer
-
PlanGrid "Issues" are used to reflect punch-list and follow-up items. Each issue reflects room #, includes a photo, and description of the issue
-
As-Built drawings are being kept and updated regularly and assigned to the As-Built layer
ORGANIZATION
-
iConstructors storage container properly organized to accommodate fire sprinkler escutcheon caps & miscellaneous salvage materials
-
All salvaged material identified and properly stored to facilitate reuse
-
Job site materials are organized in a professional manner
-
Overall, job site is neat, orderly, and professional in appearance
-
PHOTOS
-
Comments
-
Person that completed the report
-
Add drawing
-
Add media