Title Page
-
Site conducted
-
Audit Title
-
Project Name
-
Conducted on
-
Prepared by
-
Location
-
Instructions
-------------------
1. Answer "Checked" or "Hold" for the questions below, then identify the personnel who conducted the checking.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon, then "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link
Euroclad Panels
-
Main Contractor:
-
Project Number:
-
Issued to:
-
QA Sheet No:
-
Elevation:
-
Level:
-
Comments:
Pre-start checks
-
Check steelkwork is within tolerances : Column spacing as drawing, Column Level, Height, Datums marked by site engineer.
-
Personnel
- Installer
- ICS
-
Panels delivered undamaged and as per ICS schedules / drawings.
-
Personnel
- Installer
- ICS
Primary Seals
-
Ensure all Tape/air seal is installed as per ICS drawings and Spec.
-
Personnel
- Installer
- ICS
Panels
-
Panel are properly engaged into each other and horizontal joints aligned with adjacent panels. <br>
-
Personnel
- Installer
- ICS
-
Panels installed with Correct fixings as per ICS drawings and spec.
-
Personnel
- Installer
- ICS
-
Check panels are lined and levelled.
-
Personnel
- Installer
- ICS
Flashings and Secondary Seals
-
Flashings to be sealed where necessary to panels.
-
Personnel
- Installer
- ICS
-
Vertical joint and corner flashings to be fixed to panel with fixings as per ICS drawings.
-
Personnel
-
Profiled butt straps present at flashing joints. <br>
-
Personnel
Completion
-
ICS Signature:
-
Client Signature: