ICS Forms
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Handover
-
Client
-
Contract No
-
Building / Area: GL
-
Elements inspected
-
Has panel support/steel been checked?
-
All tapes and sealants are installed correctly?
-
Are all the panels lined and leveled?
-
All fixings are installed to the correct centres and as per ICS CI Drawings?
-
Have all the flashings been installed lined and levelled?
-
Are the walls cleaned and damage-free?
-
Inspection By: (for ICS Roofing LTD) Name
-
Inspection By: (for ICS Roofing LTD) Signature
-
Inspection By: (for ICS Roofing LTD) Date
-
Inspection By: (for Main Contractor) Name
-
Inspection By: (for Main Contractor) Signature
-
Inspection By: (for Main Contractor) Date