Weekly inspections.

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Checklist.

  • Is there any visual damage to the nets?

  • Is there any Debris in the nets?

  • Are all gaps between the net and the structure suitable?

  • Does the net sag between 5-10%?

  • Are all overlaps greater than 2m, or if less than 2m, are both sides of all overlaps laced together?

  • Have 8mm lacing or 12mm rope ties been used for the lacing & does the lacing go through every other mesh?

  • Are the knots tied correctly?

  • Are all nets attached to the structure/attachment device correctly?

  • Is the excess of the net gathered/under-rolled where necessary?

  • At the time of handover are there any materials or objects within 3m below the netted area?

  • Do operatives working above the nets need to take additional safety measures e.g. wearing harness?

  • Additional comments:

  • Date / Time:

  • Site Name:

  • Contractor:

  • Main Contractor:

  • Remedial action taken:

  • Signature

  • Position

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.