Information
-
Make / Model / Serial Number (Last Three numbers)
-
Conducted on
-
Prepared by
-
Client
-
Site Location / Project
-
Personnel
General
-
Safe Work Proceedure
-
Plant Service Log (Kept Electronically, on the server)
-
Operations Manual
-
Correct PPE as per SWP
-
Maintenance Toolkit and all parts / spares available
Operations
-
Fuel Level full, right fuel taken / used and enough spare fuel
-
Starts and runs ok
-
Planting auger secure to power head
-
Planting auger in good working order and free of debris
-
Cutting teeth present and not excessively worn on auger
-
All handles and casings intact