Information
-
Vehicle Registration
-
Conducted on
-
Prepared by
-
Project
-
Site location
General
-
Safe Work Procedure
-
Plant Service Log (Kept electronically)
-
Operators Manual
-
Current ticket / certificate sighted
-
Correct PPE as per SWP (including spare change of clothing)
-
Maintenance Toolkit and all parts / spares available
Operations
-
Fuel level full, right fuel taken and enough spare fuel
-
Oil Level ok
-
Rig starts Ok - Battery start & Pull start<br>
-
Remotes working & spare batteries present
-
All hoses fittings checked and hose clamps tight
-
Hoses checked for kinking, scratches and other irregularities
-
Guns in good working order - no evidence of leaking or damage
-
Gun fittings (including nozzle) secure with no sign of wear & tear or cross threading
-
Snap lock fittings working correctly
-
Workmen / Weed Spraying signs available
-
If using GPS, spare batteries available
-
Satellite Phone available if working in remote areas (and charged)
-
Chemical storage container, spill kit and first aid kit present
-
9KG Fire Extinguisher fitted (LV Vehicles)
-
Maintenance Toolkit available including spare guns