Information
-
Job Number:
-
Site Location
-
Client Name
-
Conducted on
-
Inspected by
-
Site Supervisor
-
Location
-
List Irwin Electrical personnel and subcontractors on site:
Site Folder and Paperwork
-
Have all engineers been inducted to site?
-
Have all engineers and personnel signed into site?
-
Is there a method statement and risk assessment available on site corresponding to the works?
-
Has the Method Statement been read and understood by all engineers?
-
Are Emergency / Evacuation plans clear and recorded
-
Are CSR/CSCS cards and training records available?
-
Has daily ladder register been completed?
-
Are COSHH assessments available or hazardous substances on site?
-
Are all subcontractors cleared and training information provided?
-
Is a permit to works in place?
-
Take photo of permit to work
Working Area
-
Is there adequate access and egress throughout workplace?
-
Is there good housekeeping & have materials been stored correctly?
-
Is there adequate safety signage work segregation in place
-
Are adequate emergency procedures in place?
-
Is waste segregation occurring on site?
Means of Access
-
Are ladders or steps being used?
-
Are Ladders / Steps numbered and in good condition?
-
Is the operative keeping 3 points of contact with the ladder / Steps?
-
Are mobile towers being used on site?
-
Has Mobile Tower Scaffold been erected correctly with Tags in place?
-
Was the person erecting the scaffold trained to do so? (PASMA)
-
Take photo of scaffold / Scaff tag
-
Are MEWPs (scissor lift/Cherry pickers) being used on site
-
Is the operative IPAF trained to the correct level
-
Is there a maintenance record available for MEWP
-
is a harness being used by the trained operator?
-
Insert harness plant Number
-
Has a Rescue plan been completed
-
Insert photo of rescue plan in place
Plant and Equipment
-
Is required PPE being worn as per the risk assessment?
-
Power tools in good general condition?
-
Has a Portable Appliance Test (PAT) been carried out in the last 6 Months?
-
Time and Date of PAT
-
Attach photo of sample PAT sticker
-
Are tools and equipment operated in a safe manner and in good condition?
-
Do engineers have Lock Out Tag Out kit?
-
Have test meters been calibrated within the last 3 Months?
-
Have all risks been adequately controlled by the risk assessment?
-
Is there a company vehicle on site?
-
Enter Vehicle Registration
-
Is first aid kit available in Vehicle?
-
Is the vehicle well stocked?
-
Is the vehicles van file available?
-
Is the vehicle in good condition and working order?
Closing Out
-
Have the findings of the inspection been relayed to site supervisor?
-
Signature of person conducting audit