Information
-
PTW [Number]
-
Contractor Company
-
Area of Work
-
Valid From (Date + Time)
-
Valid Until (Date + Time)
-
Jigsaw Responsible Person
- Ian Glaves
- Tom Rushby
- Trevor Arthur
- Charlie Taphouse
- Josh Moore
- Paul Clarke
- Roger Butcher
- Dave Mason
- Robert Dodson
- Jo Quinn
-
Contractor Responsible Person
-
Details of Work
Further Information
-
Is the scissor lift to be used (Full WAH Permit not needed)
-
Do we have a copy of the contractors IPAF 3A certificate
-
Are there RAMS for this Project ? If not and you are in any doubt whether they are needed contact H&S for advice
-
Discuss with the contractor how the project will be done and how you will mitigate any hazards to ALARP. Has this been Done
-
Copy to be scanned for H&S Records
-
Has the Contractor Induction Agreement been Received / Completed
-
Are You willing to Sit the Induction now
-
Please Leave site, do not start work !!
-
Equipment to be isolated
-
Electrical Lock off to be applied
-
Compressed Air ,Liquid Pipeline, Gas, Fuel to be drained and cleaned
-
Is nearby equipment safe for work to proceed
-
Have other departments been informed where necessary
-
Are barricades, hoarding or cordons required
-
Are warning notices needed ? if yes they must be posted
-
Is there adequate access, and Lighting
-
Do contractors have required PPE, including specialist PPE, Minimum safety shoes and hi-viz vest.
-
Are other permits live in the area
-
Will the Jigsaw Representative be on site for periods when the contractor is on site.
-
Name of Supervising Jigsaw Employee
-
Are all laws and regulations complied with
-
Do you Require any Further advice from H&S Department
Further Permits
-
Are Further Permits Required
-
Choose Required Permits From Dropdown List
- Hot Work
- Work at Height
- Confined Space
- Fragile Roof
- High Voltage
- Excavation
Work at Height Permit
-
The time and date of Work at Height permit is the same as specified on the work permit
-
Explain how the work at height will be carried out
-
All Persons working at height have been trained and any relevant certification has been provided
-
All tools will be secured with no potential of them falling from height
-
What form of work at height will be used
- Cherry Picker or Articulated Boom
- Scaffold Tower
- Ladders / Step Ladders
-
Has the user Completed an IPAF 3c certified Training Course
-
Has the certification been seen and a copy stored in the relevant H&S folder
-
YOU WILL NOT BE ALLOWED TO DRIVE OR OPERATE A MEWP ON THIS SITE
-
Is a safety harness required for this task
-
The user is to inspect the harness and ensure it is in an acceptable condition
-
PLEASE REPLACE THE HARNESS OR ASK YOUR HOST IF YOU CAN BORROW ONE OF JIGSAW FOODS HARNESS'S
-
Has the user completed a PASMA certified training course
-
Has the certification been seen and a copy stored in the relevant H&S folder
-
The user is to ensure the scaffold is checked for defects, is built correctly and safely and the scafftag has been completed and correctly displayed (Blank Scafftags are supplied by our H&S manager in unit 1 - contact ext 3142)
-
YOU WILL NOT BE ALLOWED TO ERECT OR CERTIFY THE SCAFFOLD TOWER - ASK YOUR HOST TO ARRANGE FOR THE TOWER TO BE BUILT FOR YOU AND THE PASMA TRAINED PERSONNEL TO INSRUCT YOU ON THE SAFE USE OF THE TOWER
-
Ladders have been checked, are in good condition and are appropriate for this task
-
DO NOT USE THIS LADDER, YOUR HOST MAY BE ABLE TO ARRANGE FOR YOU TO USE A SET OF OUR ENGINEERS LADDERS
-
A second person must be used to stabilise the ladder, this applies to all ladder types, is a second person available
-
DO NOT ATTEMPT TO USE THE LADDER UNASSISTED, YOUR HOST MAY BE ABLE TO PROVIDE SOMEONE TO ASSIST YOU
Hot Work Permit
-
The date of Hot work permit is the same as specified on the work permit
-
Explain How the hot work will be carried out
-
What time will the hot work start
-
What time will the hot work finish
-
Have Risk assessments been carried out specifically for the work to be done. They are a physical requirement of the permit
-
This Is Required and Hot Work cannot continue without this
-
Copy to be scanned for H&S Records
-
Flammable / combustible Materials removed ( 6m minimum including other side of metal cladding and walls )
-
Are fire extinguishers available at the immediate point of working (not just nearby)
-
Have fire Marshalls been briefed and placed on standby
-
Have warning notices been posted
-
Have other departments been informed of hot work where necessary
-
Has the area below the work been cordoned off
-
Have Screens been erected to protect others from intense light and UV radiation emitted from welding arc
-
Nearby cable trays and equipment protected from falling sparks
-
Is nearby equipment safe for hot work to proceed
-
has a safe grounding point for arc welding equipment been specified to the contractor
-
Loadcells and other sensitive electronics potentially sharing the same electrical grounding have been switched off or isolated
-
Is Gas cutting torch equipment and cylinders in good condition and adequately secured
-
What Personal Protective Equipment is required :- NB. In case of welding, applicable to welders and their helpers
- Full face welding visor
- Respirators or dust masks suitable for welding fumes
- welding mitts / gloves
-
Are the persons selected for the job trained in the use of any special safety equipment required
-
Is Adequate ventilation available
-
Are local regulations / laws complied with
-
Any other preparations made ( specify )
-
Please Specify
-
Any other hazards to watch for ( Specify )
-
Please Specify
-
Has a fire watch been arranged for at least 1 hour after hot work is completed to ensure that no smoldering objects exist which could flare up later
-
A FIRE WATCH MUST BE ARRANGED
-
Enter Name of Fire Watch
-
If Hot work is taking place outside normal working hours have fire marshalls been allocated on overtime for full duration of the work plus a fire watch as per above item
-
Enter name of Fire marshall
Excavation Permit
-
The time and date of excavation permit is the same as specified on the work permit
-
Explain how the excavation work will be carried out
-
Have Risk assessments been carried out specifically for the work to be done. They are a physical requirement of the permit
-
DO NOT ALLOW WORK TO START WORK UNTIL THE RELEVENT RISK ASSESSMENTS HAVE BEEN COMPLETED AND SUBMITTED
-
Copy to be scanned for H&S Records
-
Have all underground electric cables, gas pipes, water pipes, sewage pipes and other services been identified before hand
-
THESE SERVICES MUST BE IDENTIFIED BEFORE THE WORK CONTINUES
-
Ensure Proof of This, eg: site blue prints have been seen / discussed between Jigsaw Foods and the contractor
-
Is detection equipment to detect cables and metal pipes available
-
Has digging by hand been arranged for near the depth of such services and below
-
Have ground conditions been assessed
-
Have the sides of the excavation to be shored and braced (required if depth >1.5m)
-
Is there adequate access and egress
-
Have Ladders been Secured and checked
-
Are there handrails or other form of edge restraint to prevent people or vehicals falling in
-
Have vehicals been restricted from driving closer than 3m from the sides of the excavation
-
Have warning notices been posted
-
Has provision been made for drinage of rainwater and groundwater
-
Has provision been made for safe temporary storage or approved disposal of spoils
-
Are the sides monitored for signs of ground movement
-
Is a daily inspection of the excavation recorded on a logsheet
-
Are local regulations / laws complied with
-
Have other preperations made
-
Specify other preperations
-
Are There any other hazard to watch for
-
Specify other Hazards
High Voltage Permit
-
The time and date of High voltage permit is the same as specified on the work permit
-
Explain how the high voltage work will be carried out
-
Have Risk assessments been carried out specifically for the work to be done. They are a physical requirement of the permit
-
This Is Required and high voltage Work cannot continue without this
-
Copy to be scanned for H&S Records
-
Flammable / combustible Materials removed ( 6m minimum including other side of metal cladding and walls )
-
Are fire extinguishers available at the immediate point of working (not just nearby)
-
Have fire Marshalls been briefed and placed on standby
-
Have warning notices been posted
-
Have other departments been informed where necessary
-
Has the area been cordoned off
-
Have electrics been isolated and locked off where possible
-
Nearby cables in good codition and do not present a trip hazard
-
is nearby equipment safe for work to proceed
-
is the area dry and free from chemical substances
-
Loadcells and other sensitive electronics potentially sharing the same electrical grounding been switched off or isolated
-
Are voltage meters in good working condition and correctly rated for the current
-
What personal protective equipment is required (specify)
-
Are the persons selected for the job trained in the use of any special safety equipment required
-
Is adequate ventilation available
-
Are all regulations / laws complied with
-
Any other preperations made
-
Please state
-
Any other hazards to watch for
-
Please state
Confined Space Permit
-
The time and date of confined space permit is the same as specified on the work permit
-
Explain how the confined space work will be carried out
-
Have Risk assessments been carried out specifically for the work to be done. They are a physical requirement of the permit
-
This Is Required and confined space work cannot continue without this
-
Copy to be scanned for H&S Records
-
is the area resticted to entry of materials such as liquids or solids that may result in a person drowning or causing asphyxiation
-
Have all line connections been isolated by removal / blanking and has electrical equipment been isolated and locked off
-
Has equipment been properly drained / cleaned, isolated for entry of liquids or other materials
-
Have arrangements been made for sufficient ventilation
-
Has Oxygen test been carried out
-
Give result of test
-
Do hot conditions exist that could lead to dangerous increase in body temperature
-
Limit exposure measures should be put in place
-
Has the area been checked for flammable materials or tested for toxic fumes, explosimeter
-
Is adequate fire fighting equipment available
-
Is nearby equipment safe for work to proceed
-
Have other departments been informed where necessary
-
What PPE is required for the task (specify)
-
Is breathing appauratus required
-
Is specialised equipment required
-
Is there a safety rescue plan in place
-
Bosun's chair, safety harness, or other access devices in use
-
Are the persons selected for the job trained in the use of the special safety equipment required
-
Name of appointed standby person (buddy) , to watch for the safety of the person carrying out the work
-
Is adequate lighting available
-
Are local regulations / Laws complied with
-
Have any other preparations made
-
State other prearations made
-
Are there any other hazards to watch for
-
State other Hazards
Fragile Roof Permit
-
The time and date of fragile roof permit is the same as specified on the work permit
-
Explain how the fragile roof work will be carried out
-
Have Risk assessments been carried out specifically for the work to be done. They are a physical requirement of the permit
-
This Is Required and fragile roof work cannot continue without this
-
Copy to be scanned for H&S Records
-
Is there adequate access
-
Have Ladders been correctly secured and checked
-
Are there handrails or other forms of edge restraint to stop people falling
-
Is scaffolding being used
-
Has the Scaffolding been checked
-
Are working areas equipped with full-area floorboards
-
Are there fragile roof areas, ( asbestos, corroded sheeting, overpainted glass, rooflights etc.)
-
Are barricades or hoarding required
-
Have warning notices been posted
-
Has the area below the work been cordoned off
-
is nearby equipment safe for work to proceed
-
Have other departments been informed where necessary
-
What PPE is required ( specify )
-
A safety harness is to be worn at all time has this been checked
-
Is a Bosun chair to be used
-
Are the persons selected for the job trained in the use of any special safety equipment required
-
Name of appointed standby person (buddy) , to watch for the safety of the person carrying out the work
-
Is adequate lighting available
-
Are local regulations / laws being complied with
-
Have any other preparations been made
-
List any other preparations
-
Are there any other hazards to watch for
-
List other hazards
Jigsaw Foods Responsible Person sign as all information correct and sign over to contractor
-
Jigsaw Foods Responsible Person Name / Signature
-
Contractor / Engineer Name / Signature
Sign Off - Work complete and area left in a safe and tidy condition - Checked by Jigsaw Foods responsible person
-
Jigsaw Foods Responsible Person Name / Signature