Title Page
-
Conducted on
-
Prepared by
-
Location
Global light Field Services : In-Progress & Post Build Quality
-
Has Kiln dried sand been applied and vibrated in using a plate compactor fitted with a neoprene pad
undefined
-
Are all modules/paving laid within tolerance to the surrounding adjoining surfaces with no modules/paving rocking
-
Have all infills between modules/paving and kerbs been filled to the full depth including matching existing material type /colour
-
Is the fillet to the surround of the CF chamber/cabinet reinstated correctly
-
Confirm what type of Audit are you doing today?
-
Is the sub-base material matching the existing in type and to a minimum thickness of 100mm
-
Is the bedding material matching the existing in thickness and type
-
Has any damaged modules/paving been replaced with the same type, colour and thickness
-
Is the layout of modules/paving match that of the existing pattern
-
Have all edging/road kerbs removed or damaged by our works been replaced correctly
-
Auditor to sign to confirm completion of the audit