Title Page

  • Conducted on

  • Prepared by

  • Location

Global light Field Services : In-Progress & Post Build Quality

  • Has Kiln dried sand been applied and vibrated in using a plate compactor fitted with a neoprene pad

undefined

  • Are all modules/paving laid within tolerance to the surrounding adjoining surfaces with no modules/paving rocking

  • Have all infills between modules/paving and kerbs been filled to the full depth including matching existing material type /colour

  • Is the fillet to the surround of the CF chamber/cabinet reinstated correctly

  • Confirm what type of Audit are you doing today?

  • Is the sub-base material matching the existing in type and to a minimum thickness of 100mm

  • Is the bedding material matching the existing in thickness and type

  • Has any damaged modules/paving been replaced with the same type, colour and thickness

  • Is the layout of modules/paving match that of the existing pattern

  • Have all edging/road kerbs removed or damaged by our works been replaced correctly

  • Auditor to sign to confirm completion of the audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.