Information
-
Name of Facility
-
Conducted on
-
Prepared by
General Information
-
Are the SWPPP drawing on site and current?
-
Is a spill containment kit on site?
-
Type of inspection?
Weather Information
-
Has it rained since the last inspection?
-
If yes, provide:
-
Weather at time of inspection?
- Clear
- Cloudy
- Overcast
- Light Rain
- Rain
- Light Snow
- Snow
-
Do you suspect that discharges have occurred since the last inspection?
-
Are there any discharges at the time of inspection?
BMPs inspection
Good Housekeeping
-
Minimization of the discharge of spilled cement; aggregate (including sand or gravel); kiln dust; fly ash; settled dust; or other significant material
-
Using regular sweeping or other equivalent measures to minimize the presence of materials
-
Preventing exposure of fine granular solids to stormwater where practicable
Minimizing Exposure
-
Debris is picked up
-
Raw material is covered or contained
-
Dumpster lids closed (etc.)
Dust Control
-
Are dust control measures being used as needed?
-
Are roadways being swept and cleaned as needed?
Inlet Protection
-
Are all inlets that are or will be functional during operations protected?
-
Is the inlet protection being maintained?
Wash Outs
-
Are washouts adequate for the amount of material being discharged?
-
Are washouts located in a location that will not effect water inlets?
Intakes
-
Intake Number (Intake #)
-
Is the intake uncovered and free of debris?
-
Is the intake operational?
-
In good condition?
Discharge Points
-
Discharge Point ID (Refer to SWPPP Map)
-
Free of blockage?
-
In good condition?
-
Any observable pollutants?
Signatures
-
Inspector