Title Page
-
Speno Rail maintenace Australia Supervisor name
-
Sydney trains Representative name
-
Conducted on
-
CNL staff member completing the checks
Fire risk assessment
-
Who onsite has contacted the RFS and advised of grinding work in the area?
-
Current fire risk rating
- Very low <6
- Low 7-15
- Medium 16-25
- High 26-45
- Very high - Do not grind 46-75
- Do not grind >76
-
What is the level of water in the hyrail
- Full
- Half - continue working and monitor
- Below 1/4 - refill Hyrail
- Empty - stop immediately and refill
Track inspection milages
-
Grind Start kilometres
-
Grind finished kilometres
Train stop Checks
-
Train stop checks
inspection
-
Has the train shop been cleared of any slag or other material that could cause a failure
-
Has the train stop been inspected for damage
-
Has the train stop been washed
-
Please provide a photo of the train stop
-
No action required - Don't touch
GIJ inspections
-
GIJ inspections
inspection
-
Has the GIJ been cleared of any slag or other material that could cause a failure
-
Has the GJI been inspected for damage
-
Has the GIJ been washed
-
Please provide a photo of the GIJ - IF DAMAGED
-
Has any damage occurred to the GIJ
-
No action required - please do not touch
Track walked
-
Select date
-
Have you asked the protection officer if it is safe to complete the walking inspection of track.
-
Has the track been walked and all slag removed from site
Comments or other criticl information
-
Comment 1
-
Comment 2
-
Comment 3
-
Comment 4
-
Comment 5
-
Comment 6
Sign off - CNL, SPENO AND SYDT Representitives
-
CNL transport signature
-
SPENO Representative signature
-
Sydney trains representative signature