  • Audit Title - Quality Audit

  • Client / Site

  • Select date

  • Prepared By

  • Location

Information

  • Location
  • Job Number

  • Author Name and Signature

  • Select date

Section 7

Section 7 Product Realisation (Planning of product realisation)

  • 4.2A - Do you have QTS Quality Policy (Intergrated) Displayed on site

  • Add media

  • Evidence Viewed

  • 4.2D. Is there access on site, to the companies documented procedur

4.2.3 - Control of Documents

  • Is Drawing register on site? Current drawings/documentation being used? Are current drawings/docs issued to subcontractors?

  • Evidence viewed

4.2.4. - Control of Records

  • Correct up to date forms and records being used and maintained in site folders?

  • Evidence Viewed

  • Compliance improvement opportunity

5.5.3 - Internal Communication

  • Review the effectiveness of briefing arrangements and any other communications (TBT, Alerts etc.)

  • Evidence Viewed

6.2.1 - Check Resources

  • Levels of personnel is adequate for the work being undertaken (inclusive of subcontractors)

  • Evidence Viewed

6.3 - Infrastructure

  • Check IT Equipment, Internet connecting for access to shared drive, Storage facilities, Office Space, (Site Cabins etc), Company Vehicles, Welfare, Utilities

  • Evidence viewed

6.4 - Work Enviroment

  • Provision of work equipment, Lighting, Heating, etc

  • Evidence viewed

7.1 - Quality Objectivies

  • 7.1A - What quality objectives & requirements are recorded for provision of services (WPP, Method statements, Minutes of meetings) also checking Design, Specification also Quality Plan

  • Evidence Viewed

7.1(B)(C)

  • 7.1B - What processes are put in place prior to service delivery ( e.g Pre-work assessment, Risk and COSHH assessments ) include checking any relevant job sheets, Work Instruction, Installation instructions, Specification, Acceptance Criteria (ITPs) etc

  • Evidence Viewed

7.1D

  • 7.1D - What records are generated which provide evidence that the realisation process meets requirements ( Site inspections, Final inspections, and CPP, Quality plan, As built drawings )

  • Auditee

  • Evidence Viewed

7.2D

  • 7.2D - Any additional requirements determined by the organisation ( Rock cutting jobs, Inspection and test plans )

  • Evidence Viewed

7.2.3 - Customer Communication

  • Any site meeting, Actions required (Site Instructions, emails) Technical queries , Feedback and complaints log being actioned.

  • Evidence viewed

  • Compliance improvement Oppertunity

7.4.2 - Product

  • Check product and equipment acceptance requirements (Especially for network Rail)

  • Evidence viewed

7.4.3 - Verification of Purchased Product

  • 7.4.3 - Verification of purchased product - Delivery notes on site

  • Evidence Viewed

7.5.1A - What work instruction are available to staff

  • 7.5.1A - SSOW Packs, Method Statements, Task Briefings, WPP, Work Procedures, ITPs, Hold points, Checks & Supporting inspection records / COFCs etc, As built records to be checked, check correct equipment is being used (And serviced fit for purpose etc)

  • Evidence Viewed

7.5.1F

  • 7.5.1-F - What arrangements are in place for product release, Delivery & post delivery, Activies ( Test and Inspection Plans )

  • Auditee

  • Evidence Viewed

7.5.4 - Where applicable - how are customers supplied good identified, Verified and protected

  • 7.5.4 - Asset management plan where applicable, Protection arrangement ( before and after photos) asset register, Storage arrangement to be checked

  • Auditee

7.5.5 - Can you demonstrate how products are managed during projects ( Site security, Fenced, Locked compound

  • 7.5.5 - Check for provision of stores, product left in original packaging, Special storage requirements (To be melted dry or at a certain temperature etc) Lay down ares, Handling requirements etc

  • Evidence Viewed

  • Compliance improvement opportunity

7.6 - Control of monitoring and measuring equipment - how is the monitoring and measuring equipment managed (Check equipment with stores to ensure it is logged

  • Check that equipment is labeled up with calibration sticker (Serial matching calibration certificate etc) check storage and handling / use arrangements to prevent damage and deterioration. Recall and re-checking procedures for product where instructed drift has been identified by the calibration house

  • Auditee

  • Evidence Viewed -

7.6A Equipment / Testing

  • 7.6A - Can you show me that equipment used for testing is traceable to international standards ( Check company that has calibrated equipment )

  • Evidence Viewed

  • Compliance / Improvement Opportunity

7.6B

  • 7.6B - Can you show me that equipment can not be adjusted or re-adjusted

  • Auditee

  • Evidence Viewed

7.6C

  • 7.6C - Can you show me that the calibration status can be determined

  • Evidence Viewed

7.6D

  • 7.6D - That the equipment has been safeguarded from adjustments

  • Auditee

  • Evidence Viewed

  • Compliance / Improvement Opportunity

7.6E

  • 7.6E - That the equipment has been protected from damage and deterioration during handling maintenance and storage ( Check Storage )

  • Evidence Viewed

8.2.4 - Inspection& and Testing

  • Inspection and test results to be checked, Verification records (Pass or fail / accept or reject etc) Subcontractor records or certification signed off as complete. Completion certificate if required / handover records, Client sign off etc

  • Evidence viewed

8.2.3 - Check for NCRs being raised

  • Snagging list and appropriate action plans for resolution are implemented where non conformity is identified ( this section ties into section 8.5.2 corrective action and 8.5.3 preventive action) Check that NCRs are sent to compliance. Check effectiveness of corrective and preventive actions

  • Auditee

  • Evidence viewed

  • Compliance improvement Oppertunity

Sub- Contractors

  • Have sub- Contractors been issued with subcontract packs EG. Drawings, Specs. WPP ETC

  • Evidence Viewed

  • Have subcontractors received a site induction ( Evidence of this )

  • Evidence Viewed

  • Are subcontractors monitored on work activities ( Site Tours )

  • Evidence Viewed

  • Are all subcontractors on the approved supplier list

  • Evidence Viewed

  • Has a review of the subcontractor been carried out on their performance ( Unless this is first occasion a complete form 213 )

  • Evidence Viewed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.